Loading...
PD151-DR 960125 (3) '~;ELECTRIC Comments for the City of Coppell Development Review Committee Pr. el~m~nary/Fil,al Plat £~r ~ Date I-- ~-''<~- -~ ~ Preliminary/Final Plat is not acceptable. /~aEasements will be required for proposed electric facilities. A plat with easement requirements will be provided to the developer. Load information (size of structure, A/C / Heat Load) will be required from the developer before easements can be 1etermined' Please call me at 214-888-1307 if you have any questions. Tim Brancheau 14-~00 Josey Lane Farmers Branch. Texas 75234