PD159-DR 970130 (4) Preliminary/Final Plat is not acceptable.
k/Easements will be required for proposed electric facilities.
A plat with easement requirements will be provided to the
developer.
[/Load information (size of structure, A/C / Heat Load) will
be required from the developer before easements can be
determined.
~Other comments ? ~ a d~ ~ [? ~'T~ ~ ~.~_
Please call me at ~-888-1307 if you have any questions.
Tim Brancheau
4400 Josey Lane Farmers Branch. Texas 75234