Loading...
PD163-DR 970731 (6)Date m l " ELEC TRIC Comments for the City of Coppell Development Review Committee Preliminary/Final Plat is not acceptable. V/Easements will be required for proposed electric facilities. A plat with easement requirements will be provided to the developer. ~/ Load information (size of structure, A/C / Heat Load) will be required from the developer before easements can be determined. / Other comments P~ 'S ~~ ~ Please call me at~f~888-1307 if you have any questions. Tim Brancheau 14400 Josey Lane Farmers Branch, Texas 75234