Loading...
PD165-DR 971223 (7)D£C-23-87 14:20 FROM:TU FARMERS BRANCH CUST SV ID:8728881304 PAGE 4/6 ~ --____ DEC 231997 ~ELECTRIC Comments for the City of Coppell Development Review Committee Preliminary/Final Plat is not acceptable. Easements will be required for proposed electric facilities. A plat with easement requirements will be provided to the developer. Load information (size of structure, AC/Heat Load) will be required from the developer before easements can be determined. ~'/ Other comments e~_ ,/~C/_~~t'...~ Please call me at 972/888-1307 if you have any questions. Tim Brancheau 14400 Sony Lam-- F~rrn~r~ Br~l~ Tcxa~ ?$234