Loading...
PD165-DR 980129 (6) ti~,x~ JAN~OI~ ~ELECTRIC Comments for the City of Coppell Development Review Committee P~climinary/Final Plat for Date Preliminary/Final Plat is not acceptable. Easements will be required for proposed electric facilities. A plat with easement requirements will be provided to the developer. Load information (size of structure, AC/Heat Load) will be required from the developer before easements can be determined. 'V// Other comments '~/'~ Please call me at 972/888-1307 if you have any questions. Tim Brancheau 14400 Josey Lane Farme~ Branch, Texas 75234