Loading...
PD169-DR 980326 (5) Comments for the City of Coppell Development Review Committee 3-26-98 Preliminary/Final Plat is not acceptable. jEasements will be required for proposed electric/gas facilities. A plat with Lasement requirements will be provided to the developer. oad information (size of structure, A/C, heat load) will be required from the developer before easements can be determined. Other comments Please call me at 972/888-1307 if you have any questions. Tim Brancheau 14400 Josey Lane Farmers Branch, Texas 75234