PD149-DR 951228ENGINEERING COMMENTS
PD-149. Vistas of Coppell. zon/ng change from "HC" (Highway
Commercial), "MF-2" (MuM-family 2), "l~ (Light Industrial), and
(Commercial) to "PD-SF-7 and MF-2" (Planned Development, Single-
family-7 and Multi-family-2), to allow the development of single-fatnily
and multi-family residential uses on 128.15 acres of land, located on the
east side of Denton Tap Road, north of the Denton Creek, at the request
of Carter & Burgess, Inc.
DRC DATE: December 28, 1995 and January 4, 1996
CONTACT: Ken Griffin, P.E., Assistant City Manager/City Engineer 004-3679)
COMMENT STATUS: ~PRELIMINARY FtNA~
Show city limits.
There is a concern about the traffic impact that these developments may have on the access
road of S.H. 121 Bypass. Traffic signals may need to be provided to allow vehicles to exit
the subdivisions. In addition, a traffic impact analysis should be provided to determine the
impact on Denton Tap and MacArthur Blvd. by these developments to determine if
mitigation measures are required.
Phase I
1. Provide a deceleration lane with a 100' storage and 100' taper on the frontage road.
2. Show city limits.
3. Please provide corner clips at all street intersections for handicap ramps.
4. Variance for alleys required.
5. The alley intersecting Street P should intersect at a 90 degree angle, not on a skew.
6. Street L will act as a collector; therefore, you should try to turn the alleys between Streets
N and M and between Streets N and P so that they do not intersect Street L.
7. Information should be provided on the flood protection provided by the levee. The Coppell
Floodplain Ordinance requires that the height of the levee be based on the standard project
flood elevation, plus 3 feet of freeboard.
8. Any access to the state highway will also require TxDOT approval.
Page 2
PD-149, Vistas of Coppell
Phase H
DEC 2 8
1995
10.
11.
12.
13.
Permission will be required from Lone Star Gas to extend the street over their easement.
Any access to the state highway will also require TxDOT approval.
Deceleration lane with 100' storage and 100' transition should be provided at the access
points to the highway frontage road.
All alleys should intersect the streets at 90 degree angles.
A 4' sidewalk in the park area is inadequate for a trail system.
Street J should act as a collector; therefore, the alleys between Street F and H and between
Street K and H should be turned so that they do not intersect Street J.
Corner clips should be provided at all street intersections for handicap ramps.
Please comment as to what the item is on Lot 12, Block J.
Information should be provided on the flood protection provided by the levee. The
Coppell Floodplain Ordinance requires that the height of the levee be based on the standard
project flood elevation plus 3 feet of freeboard.
The drainage easement adjacent to Lots 1-15, Block K should be dimensioned on each lot.
The City has a concern about the length of Street J when it is also extended into Phase I
in regards to traffic. We have various streets similar to this in the City of Coppell of
which we receive a complaints on speeding vehicles and cut through traffic. The City
requests that you look at reconfiguring the road to discourage speeders and/or cut through
traffic. This might be accomplished with some type of additional curvature in the street,
cul-de-sacs, off setting the street so that it is not a continuous mn, traffic circle, or any
other traffic control device of which would be agreeable to the City.
The plan shows to dedicate the area that is a 50' Lone Star Gas easement to the City of
Coppell for a park. I have a question as to whether or not the City wants this dedicated
as a park because of what could be future problems in actually constructing something in
the Lone Star Gas easement. Obviously, the Lone Star Gas easement has to be left open
and we have had some problems with the existing Lone Star Gas easement that crosses
Denton Tap when developers have tried to build on it.
The location of the existing 25' drainage and sewer easement across the back of Lots 1-15,
Block K will pose a problem to the City of Coppell in the future as the homes are built and
the property developed. The easement is not at the rear of the property, but across the east
half of the property. I know that the drainage system is existing and will be expensive to
relocate, but you should review this situation to determine if there is a way to reconfigure
the lots so that the easement is at the very rear of the lot as opposed to cutting through the
east half of the lot.
Phase III
Comer clips should be provided at all street intersections for handicap ramps.
Information should be provided on the flood protection provided by the levee. The
Coppell Floodplain Ordinance requires that the height of the levee be based on the standard
project flood elevation plus 3 feet of freeboard.
Show the floodplain limits adjacent to the site along with the floodplain elevations.
Any access to the state highway will also require TxDOT approval.
Page 3
PD-149, Vistas of Coppell
Phase IV
1995
Deceleration lane should be provided for the access that intersects the state highway.
Any access to the state highway will also require TxDOT approval.
Phase V
Any access to the state highway will also require TxDOT approval.
Show the City Limits.
More than likely any controlled access to this site will be at Highland Drive or S.H. 121.
Therefore, the City requests that you try to limit your access from Denton Tap Road and
possibly take all of your access off of Highway Drive or S.H. 121.