PD149-DR 960104"t~ELECTRIC
JAN 5 1996
Date
Comments for the City of Coppell
Development Review Committee
Preliminary/Final Plat ~or'
Preliminary/Final Plat is not acceptable.
Easements will be required for proposed electric facilities.
A plat with easement requirements will be provided to the
developer.
Load information (size of structure, A/C / Heat Load) will
be required from the developer before easements can be
determined.
Other comments ~~ l~ ~ ~_¢__~ ~q--~ L- ~
Please call me at 214-888-1307 if you have any questions.
Tim Brancheau
14400 Josey Lane Farmers Branch, Texas 75234