Loading...
PD149-DR 960104"t~ELECTRIC JAN 5 1996 Date Comments for the City of Coppell Development Review Committee Preliminary/Final Plat ~or' Preliminary/Final Plat is not acceptable. Easements will be required for proposed electric facilities. A plat with easement requirements will be provided to the developer. Load information (size of structure, A/C / Heat Load) will be required from the developer before easements can be determined. Other comments ~~ l~ ~ ~_¢__~ ~q--~ L- ~ Please call me at 214-888-1307 if you have any questions. Tim Brancheau 14400 Josey Lane Farmers Branch, Texas 75234