Loading...
PD185-DR000330 City of Coppell Development Review Committee Comments Planning Department P.D.-185-LI COPPELL INDUSTRIAl. ADDITION (CHAMPION PARTNERS) North side of W. Bethel Road, East of N. Royal Lane 1. You may want to delay this case one month because of the number of concerns we have with this submittal including: -a 1200 foot long industrial building (with possible expansion to 1900 feet) needs facade articulation to break up the mass of the building. -because of the size of these buildings and recognizing the Postal Facility included additional setbacks from property lines, it would be prudent to consider greater landscape setbacks along Bethel Road. We suggest 50 feet with berms and extensive landscaping (Note: the Minyards facility has generated criticism for its minimal setbacks and landscaping along Bethel Road). Also consider additional landscaping and setbacks along Creekview Drive (not Road). Sections of both Bethel Road and Creekview Drive landscaping proposals (width of landscaping, height of trees and building, berm, etc.) needed -for public hearing purposes, exhibits will need to be reduced to 8 1/2 x. 11 size. Combine sheets L1-01,02,03 to one reduced exhibit; same with all other submittals. Try to get exhibits L1-01,02,03 on one 24-x36 sheet -Truck parking areas must be totally screened from public r.o.w., generally by solid masonry screening walls (see Section 33 of Zoning- ordinance) -Zoning ordinance requires office parking at 1:300; warehousing at 1:1000. It is your responsibility to justify less stringent guidelines, which will be difficult to do -Clearly identify exhibit Ll-03 (Perhaps LI.O1 can show how it relates to L1-01,02,03) -Our initial calculations show required perimeter landscaping at 97,680 square feet. I do not see that figure on any of your submittals -Identify Building 1, Building 2, Phase I, Phase II, etc. on all exhibits; make sure landscape architectural/architectural drawings all use same notations throughout -Site area, building area, parking area calculations do not match--staff can not determine landscape requirements without consistent data!r -monument signs can not exceed 60 square feet -your landscape calculations need to clearly show: 1- interior landscape required; 2- perimeter landscape required; 3-non-vehicular landscape required -all planting islands shall include at least one tree and contain shrubs, lawn, and ground cover -consideration should be given to retention vs. detention ponds because of landscaping proposal DRC Date: March 30, 2000 Planning & Zoning Commission Meeting: April 20, 2000 City Council Meeting: May 9, 2000 .Note: A. Please revise plats, site plans, landscape plans, and building elevations based on staff recommendations. Should applicant disagree with staff comments please provide reasons why staff recommendations should not be followed when you attend the April 6th Development Review Committee (DRC) meeting. B. Each applicant will bring one new set of revised plats and plans to the April 6th DRC meeting. Applicants will be asked to show, explain and defend any revision. An Engineer for the project or other representative is urged to attend the meeting. C. Applicant will have till noon Tuesday, April 11th to resubmit eighteen (18) folded copies of revised plans and three (3) reduced paper copies (8 1/2 X I 1) of each exhibit to the Planning Department