PD183-DR 991228 (3) DEC .'
DEVELOPMENT REVIEW Cb /Ta/ [TTEE
ENGINEERING COMMENTS
ITEM: PD-183, Coppell High School, a zoning change request from "C and $F-12"
Commercial and Single-Family-12 to "PD-C" Planned Development,
Commercial, to allow a 6' high decorative metal screening fence with
landscaping along the northern edge of the new parking lot, as well as
incorporate the previously approved site plan allowing the construction of
concession stands, a press box, additional seating at the existing football
stadium, as well as a multipurpose building, tennis court, tennis center, storage
facility and additional parking on property to this planned development to be
located at 185 I9'. Parkway Boulevard, at the request of Glenn Engineering,
Inc. '
DRC DA TE: December 28, 1999 and January 6, 2000
CONTACT: Mike Martin, P.E., Assistant City Engineer (972-304-3679)
COMMENT STATUS: PRELIMINARY
1. No improvements will be allowed in the lO0-year floodplain until a flood study is approved
by the City.