Loading...
PD183-DR000330 (7) DEVELOPMENT REVIEW COMMITTEE ENGINEERING COMMENTS ITEM: PD-183, Coppell High School. zoning change request from C and SF-12 (Commercial and Single-Family-12) to PD-C (Planned Development, Commercial), to allow a 6' high decorative metal screening fence with landscaping along the northern edge of the new parking lot, as well as incorporate the previously approved site plan allowing the construction of concession stands, a press box, additional seating at the existing football stadium, as well as a multipurpose building, tennis court, tennis center, storage facility and additional parking on property, to this planned development located at 185 IF. Parkway Boulevard, at the request of Glenn Engineering, Inc. DRC DA TE: &larch 30, 2000 and April 6, 2000 CONTACT: i~like~lartin, P.E., Assistant City Engineer (972-304-3679) PREL IMINA R Y RE VISED AFTER P&Z No comments.