Loading...
PD183-DR 991123 (2) , No,,' DEVELOPMENT REVIEW COMMITTEE ........... C -_ ENGINEERING COMMENTS ITEM: PD-183, Coppell High School, a zoning change request from "¢ and SF-12" Commercial and Single-Family-12 to "PD-C" Planned Development, Commercial, to allow a 6' high decorative metal screening fence with landscaping along the northern edge of the new parking lot, as well as incorporate the previously approved site plan allowing the construction of concession stands, a press box, additional seating at the existing football stadium, as well as a multipurpose building, tennis court, tennis center, storage facility and additional parking on property to this planned development to be located at 185 }V. Parkway Boulevard, at the request of Glenn Engineering, Inc. DRC DA TE: November 23, 1999 and December 2, 1999 CONTACT: Mike Martin, P.E., Assistant Cio, Engineer (972-304-3679) COMMENT STA TUS: ~PRELIMINAR Y FINAL REVISED AFTER P&Z 1. No improvements will be allowed in the lO0-year floodplain until you have an approved flood study.