Loading...
Applicant response-DRC 1/8/87 I IEROE-LUNSFORD ASSOCIATES, INC. ~ ~ CONSULTING ENGINEERS January 8, 1987 · Shohre Daneshmand - Ms ciCivilty of Engineeringcoppell Department P.O. Box 478 Coppell, Texas 75019 Subject: Advantage Self-Storage (Final Plat) Dear Ms. Daneshmand: In answer to your engineering review of the above subject project that I discussed with you on January 5, 1987, the foregoing answers your questions in the order that you presented them: 1. The property line has been shaded to clearly show the property lines of the site· 2. We have added a 6' curb-inlet to supplement the existing 10' inlet at the cul-de-sac on Northlake Drive· At Q5 plus the overflow to the drainage swale to the north of the cul-de-sac. The storm sewer capacity now meets your drainage s tanda rds. 3. All calculations for the subject project were made using Technical Paper 40 to compute rainfall intensities. Your design criteria allows for a five year Frequency Storm if provision is made for the overflow. 4. Hydraulic calculations have been corrected using Q5 plus an overflow; therefore, the drainage inlet is adequate. 5. Contours for the drainage area map were taken from a U.S.G.S. Map. The site grading plan are correct as they were made by my survey in the field. Corrections have been made· 6. X-inlet is from City of Coppell standard details· Outside dimensions of X-inlet is 3 1/2' square. 7. Our plans will be combined with the architectual plans prepared by Joseph Gordon, Architect, which will be presented to you under his cover sheet. 8. Inlet calculations have been added to the Plan Sheet as requested. 9. The 28 CFS By-Pass on Drainage Area 2, passes through the blockout in the wall and is passed through the project in the street to a flume that conducts it into the drainage ditch· 3109 CARLISLE, SUITE 206 3901 W. PIONEER PARKWAY, SUITE 100 DALLA& TEXAS 75204 ARLINGTON, TEXAS 76013 (214) 871-2126 (817) 461-5868 Metro January 8, 1987 Page 2 10. The storm sewer system is designed for a 5 year Frequency Storm with the overflow being carried on the surface. Under these conditions the storm sewer system is adequate. 11. The design engineer and the owner consider the site drainage adequate for the purpose. 12. We have shown the storm drainage system on the Site Grading Plan (Sbt. C-2) as requested. 13. Radius pipe will be used in place of the 2-45° bends where it makes a sharp turn through the project. 14. We will furnish you a letter signed by the adjacent property owner, William G. Thompson granting permission for grading on his property. 15. Flow arrows have been heavied up to show the sheet flow of the storm water on the site as requested. 16. Dimensions have been added to the proposed drainage easement on the final plat for the property in the northwest corner of the project. 17. There is only one rest room on the site. Standard construction for a 4" line into the existing 8" line will be through a sanitary wye. 18. All Times of Concentrations used in the calculations of this project have been 10 minutes. Thank you for your time and consideration in review of this project. If I can be of further assistance in clarifying design matters, please call me. Sincerely Yours, PIERCE-LUNSFORD ASSOCIATES, INC. Richard C. Pierce, P.E. President RCP/sh cc: Joe Beard