Loading...
Approval of PP 9/9/97 AGENDA REQUEST FORM ~ CITY COUNCIL MEETING: September 9, 1997 ITEM # ~ ITEM CAPTION: Consider approval of Alford Media Addition, Preliminary Plat and Site Plan, to allow the development of a 41,231 square foot office/warehouse facility on 14.76 acres of property located along the east side of State Road, approximately 2,400 feet south of Sandy Lake Road. SUBMITTED BY: Gary L. Sieb TITLE: Director of Planning and Community Services STAFF RECOMMENDS: Approval X Denial STAFF COMMENTS: Date of P&Z Meetinq: August 21, 1997 Decision of P&Z Commission: Approved (6-0) with Commissioners Redford, Cruse, Lowry, McCaffrey, DeFilippo and Stewart voting in favor. None opposed. Commissioner Jones resigned from the Commission. Approval subject to Engineering comments (attached to the Staff Report) and subject to the following comments: 1) Provision of underground electrical service to all on-site facilities from a point east of the warehouse/office building; north of the residential area. 2) Show width of existing State Road right-of-way. 3) Correct spelling errors in signature blocks. 4) Show Fennell property zoned LI. 5) Show Bray Brothers property zoned 2F-9. 6) Show eastern portion of site and Irby Addition zoned SF-12. Approval of the Site Plan subject to the following condition: 1) City Council granting a waiver of paragraph 1, Section 33-1, of the Zoning Ordinance, applicable to screening. ,? APPROVED , BY -!,1 Ci]Y COUNC iL DI". INITIALS: S FIN. REVIEW~ ~TY MAN. AG. REVIEW: ~1 Agenda Request Form - Revised 1/97 Document Name alfordm. PZ ~ ! CITY OF COPPELL PLANNING DEPARTMENT STAFF REPORT CASE: ALFORD MEDIA, PRELIMINARY PLAT AND SITE PLAN P & Z HEARING DATE: August 21, 1997 C.C. HEARING DATE: September 9, 1997 LOCATION: East side of State Road, approximately 2,400 feet south of West Sandy Lake Road. SIZE OF AREA: 14.76 acres, 41,231 s.f. building proposed CURRENT ZONING: LI, SF-12 and LI-S.U.P. (Light Industrial, Single-Family Residential-12 and Light Industrial, Special Use Permit) REQUEST: Development of a 41,231 square foot office/warehouse facility APPLICANT: Alford Media Services, Inc. Engineer: 12901 Hutton Drive Dunaway Associates, Inc. Dallas TX 75234 2351 W. Northwest Hwy, Ste 3280 972-241-9400 Dallas TX 75220 Fax 972-241-0800 214-654-0123 Fax 214-654-0122 HISTORY: There is no previous platting history on this property. TRANSPORTATION: State Road is an existing 2-lane asphalt roadway. The Thoroughfare Plan shows State Road within the alignment for the connection of Freeport Parkway from its current terminus at Bethel Road to its newest segment northwest of State Highway 121, at the entrance to DFW Trade Center. The standards for this future Freeport Parkway connection are a 120'-wide right-of-way containing a C4D/6 4-lane divided collector street capable of expansion to 6 lanes with an on-road bike trail on each side. Item # 12 SURROUNDING LAND USE & ZONING: North - Single-family residence; LI South - Single-family residence; LI East - Single-family residential development & mobile home park; SF-12 & 2F-9 West - Vacant, park land; LI COMPREHENSIVE PLAN: The Comprehensive Plan shows the property suitable for light industrial/showroom uses west of the mobile home park and medium-density residential uses north of the mobile home park. DISCUSSION: Based on a tree survey of three 50' by 50' sample areas, which showed trees 8" caliper and larger spaced on average every 12 to 15 feet, this 14~-acre site may contain as many as 3500 trees of this size. Approximately 25 % of the total site will be devoted to new development. Therefore, 75 % of the trees will be preserved. In addition, the applicant has provided a survey of all trees 24" in caliper or larger. There are a total of nine: five 24" post oaks, one 24" oak of another variety, two 24" Texas ashes and one 28" Texas ash. Site development will require the removal of 4 oaks. Also, a proposed driveway between two of the ash trees may affect their ability to survive. Except on the north, the area to be developed adjoins Light Industrial zoning, although there is an occupied house on each side of the State Road frontage, both zoned LI. The single-family residential zoning which borders on the north consists of a strip of landlocked City-owned property in the flood plain and the south end of Oak Bend Estates. The city acquired the flood land through tax foreclosure. The lots on the most southerly side of Oak Bend Estates extend into the flood plain a distance of 170 feet to 280 feet. The closest house in Oak Bend is at least 100 yards away from proposed development on the property, and separated by dense woodland. The house which faces State Road north of this property, on the other hand, is located only 15 feet north of the property line. The house which faces State Road south of this property is located about 70 feet south of the property line. The planning staff is highly supportive of this use for the property. It preserves 11 acres of woodland, far more than typical residential development would preserve. Furthermore, it is sufficiently removed and concealed from residentially zoned single-family development. There are a few minor adjustments which staff will recommend. The proposed driveway location is very close to an existing house on the Item # 12 north. Moving it to a point more nearly midway between the two houses which face State Road would remove truck traffic turning into the driveway a more suitable distance and would keep two large trees from potential jeopardy. Also, there is existing overhead wiring on the property which the planning staff believes is no longer appropriate. Other items are more perfunctory in nature. RECOMMENDATION TO THE PLANNING AND ZONING COMMISSION: The planning staff recommends approval of the preliminary plat subject to Engineering Comments and the following conditions: 1) Removal of on-site overhead wiring, provision of underground electrical service to all on-site facilities and, if service is taken from overhead lines on the west side of State Road, provision of underground wiring beneath State Road. 2) Show width of existing State Road right-of-way. 3) Correct spelling errors in signature blocks. 4) Show Fennell property zoned LI. 5) Show Bray Brothers property zoned 2F-9. 6) Show eastern portion of site and Irby Addition zoned SF-12. The planning staff recommends approval of the site plan subject to the following conditions: 1) Relocation of the driveway entrance, or other measure, to mitigate the noise of entering truck traffic disturbing occupants of the 2 nearby residential structures. 2) City Council granting a waiver of paragraph 1, Section 33-1, of the Zoning Ordinance, applicable to screening. ALTERNATIVES: 1) Recommend approval of the plat and/or site plan. 2) Recommend disapproval of the plat and/or site plan. 3) Recommend modification of the plat and/or site plan. 4) Recommend approval of the plat, but take the site plan under advisement for reconsideration at a later date. ATTACHMENTS: 1) Grading and Utility Plan 2) Preliminary Plat Item # 12 3) Site Plan 4) North Elevation 5) Entry Drive Landscape Plan 6) Building Site Landscape Plan 7) Entry Drive Irrigation Plan 8) Building Site Irrigation Plan 9) Dumpster Screening Wall Elevations 10) Entry Sign and Pylon Elevations 11) Exterior Lighting Specifications 12) Departmental Comments Item # 12 DEVELOPMENT REVIEW COMMJ 2 8 199 ENGINEERING COMMENT ITEM: Alford Media Addition, Preliminar~ Plat and Site Plan, to allow the development of a 41,231 square foot office/warehouse facility on 14. 76 acres of property located along the east side of State Road, approximately 2, 400 feet south of Sandy Lake Road, at the request of Dunaway Associates, Inc. DRC DATE: July 31, 1997 and August 7, 1997 CONTACT: Mike Martin, P.E., Assistant City Engineer (304-3679) COMMENT STATUS: p~'~ ~a~n~ ~v ~'~n~ · /REVISED AFTER P&Z Preliminary Plat 1. Show the existing right-of-way for State Rd. 2. Show the easement for the existing sanitary sewer line located on the east side of the property. 3. Show the sight visibility triangles for the existing State Rd. at ingress and egress locations. 4. Need to meet with staff regarding the extension of the water line to State Road. 5. The proposed monument sign is shown in the proposed right-of-way dedication for future Freeport Parkway. This can not be allowed unless the City approves a license agreement. 6. Impact Fees will be required. 7. The utility easement needs to be a minimum of 20' wide.