Loading...
PD162-CS 970910COPPELL, TEXAS 75019 RO. Box 478 Coppell. Texas 75019 972-462-0022 September 10, 1997 WHRB Real Estate L.P. 4801 Woodway, Suite 102W Houston, TX 77056 RE: Case No. PD-162, Archon Apartments Dear Madam/Sir: This letter is to inform you that Case No. PD-162, Archon Apartments, zoning change for property zoned LI (Light Industrial) to PD-MF (Planned Development, Multi-Family) to permit a 600-unit apartment complex to be constructed in two phases on 37.77 acres of property located on the south side of Beltline Road, approximately 2,100 feet east of MacArthur Boulevard was approved by the Coppell City Council on Tuesday, September 9, 1997, subject to the Site Plan, building elevations and landscape plan; also, subject to Engineering comments relative to the Site Plan (attached) and subject to the following conditions: Exterior brick for Phase One to be Acme Sandpiper Heritage or similar brick as the majority material with Acme Silver Kings or similar material as the accent brick; roof material for Phase One to be Elk Antique Slate or similar material; exterior paints for Phase One to be Sandbar Sherwin Williams 2073 or similar color or brand for siding, Copper Nail Sherwin Williams 2315 or similar color or brand for accent, and Rocky Coast Sherwin Williams 2001 or similar color or brand for fascia trim. Exterior brick for Phase Two to be Acme Quorum or similar brick; roof material for Phase Two to be Weathered Wood Composition Shingle or similar material; exterior paints for Phase Two to be Sandbar Sherwin Williams 2073 or similar color or brand for siding, Dense Forest Sherwin Williams 2259 or similar color or brand for accent, and Rocky Coast Sherwin Williams 2001 or similar color or brand for fascia trim. The 20' utility easement shall be extended across the LI (Light Industrial) tract of land and the 10' Hike and Bike Trail to the west of the development, extending from Beltline Road south to the Levee area, shall be extended in the 20' utility easement to the entrance of the development across Fairway Drive in lieu of the required 5' sidewalk along the northern property line, parallel to Beltline Road. This notation needs to be shown on the Plat, as well as the Site Plan. The 10' wide Hike and Bike Trail shall be built to City specifications as enumerated in the applicant's September 4, 1997, letter, and if decorative brick pavers are used, their quality shall be to City specifications. 3. Building heights shall be consistent with the table shown on the Elevation Plan as submitted. Buildings 2 and 27 will be two-story; Buildings 5 and 38 will be three-story. You are advised that the agreement outlined in the September 4, 1997, letter from Hughes & Luce, L.L.P., will be incorporated in a separate instrument. The Council also approved an amendment to the Comprehensive Master Plan to show this 33- acre site suitable for multi-family residential uses. In order to prepare an Ordinance, we need to assemble appropriate documentation. When this has been completed and the Ordinance has been approved by Council, a copy will be sent to you. If you have any questions, please contact me at (972) 304-3675. Sixmerely, ~,,,, lCary ~L. Sieb, A.I.C.P. lDirec[or of Planning & Community Services Archon Corporation Isabelle Moro, AICP, P&Z Coordinator Building Inspection DEVELOPMENT REVIEW COMM] ENGINEERING COMMENT, Gunner Subdivision, Lots 1-2, Block A. Preliq construction of a 600 unit apartment developt~ in two phases on separate tracts of land totaling 37. 77 acres of property, located on the south side of Be!t!ine Roa~ approximate~ 2,100 feet of MacArthur Boulevard, at the request of Carson- Salcedo-Me ~, Inc. DRC DATE: July 31, 1997 and August 7, 1997 CONTACT: Mike Martin, P.E., Assistant City Engineer (304-3679) COMMENT STATUS: .~?.~!t~tt~,~!:~.l /REVISED AFTER P&Z Preliminary Plat I. Provide utility easement for meter vaults. Informational Comments 2. Permission must be provided from the Trinity River Authority (TRA) to connect to their sanitary sewer line. 3. There needs to be discussion about participation in the cost of the proposed traffic light at Fairway Drive. 4. Provide conduit and traffic pull boxes at driveway for possible future traffic signal. Site Plan 5. Show the correct sight visibility triangles at entrance driveway.