Big Cedar/PP-AG 911008ITEM CAPTION:
Consideration and approval of a preliminary plat request fo~ Big Cedar Addition, on property
located along the west side of Bethel School Road and approximately 400' north of Bethel Road,
at the request of Matthews S.W. Investments.
,' ~.~ ~, ~...--...., :.- ~ .... -.,. .. ·
2) that they address the entry with a monument sign and landscaping;
3) that they address the access easement with a sidewalk and landscaping;
4) that they provide an alley behind Lots 37 through 41; and
S) that the developer provide tree survey for the development
As Council will recall, during discussion involving the cul-de-sacing of Bethel School Road,
the Fire Department had concern with fire protection response time if access at Bethel and
Bethel School was eliminated. To address this concern, the representatives of both University
Park (now known as Big Cedar) and Country Place, agreed to sprinkler houses built in those
subdivisions if Bethel School was removed from the thoroughfare plan and down-graded to a
local street.
The representative of Big Cedar contends that such an agreement was never "officially" adopted,
(see letter dated October 4, 1991), and sprinkle_red houses should not be a condition of zo~inoo
and plat approval. Staff disagrees and recommends that the sprinkler condition be clearly stated
in considering both the zoning and subdivision plat.
N/A
BUDGET AMT. AMT. ESTIMATRr~
AMT +/- BUDGET FINANCIAL REVIEW BY ~
COMMF. NTS:
I EWEW BX: VIEW D nX CM:
~(~.~.N~.A RE~UF. ST .=OPM Rk~,qSED ~..'91
.. Roy.,'
SL?PORT DOCL~ENTATION FOR AGENDA ITEM
5=TA,MP RECEIVED BY CITY ,V~NAGER'S OFFICE;
SUPPORT DOCLq~NTATION SUBMITTED WITM AGENDA ITEM: NO. OF ORIGINALS REQUIRED
MEMOS/LETTERS/REPORTS/BILLS/MINUTES: ~ i each
CC%~-Y~-CT/AGY-r~--~iE- NT ................. : 3 originals for signature
C. '.P. CONTRACT ..................... : 6 originals for signature
CF~WGE ORDERS ....................... ,. 3 originals for signature
m
ORDINANCE ........................... : 1 blueback for signature + 3 copies
CAPTION ............................. : 1 blueback for signature + 3 copies
RESOLUTION .......................... : 2 bluebacks for signature + 1 copy
PRC¢I~MATION ........................ : 2 bluebacks for signature + I copy
BID ............................... .. : 1 each
LOCATIO~ MAPS ....................... : 12
ZONING PI~S ........................ : 12
PRELI?FfNARY/'FIN~L PLATS ............. : ~ 12
SITE PLANS .......................... : 12
LANk'SCAPE PLANS ..................... : 12
ARCHITECT%~AL RENDERINGS ............ : 12
DATE pLrBLISHED IN THE CITIZENS' ADVOCATE:
NOTIFICATION TO:
DATE/MEn'dOD OF CONTACT:
NOTES
?N? S~EET.0588DS
CITY OF COPPELL
PLANNING DEPARTMENT
STAFF REPORT
BIG CEDAR ADDITION - PRELIMINARY PLAT
P & Z HEARING DATE: September 19, 1991
C. C. HEARING DATE: October 8, 1991
LOCATION: Along the west side of Bethel School Road and approximately
400' north of Bethel Road.
SIZE OF AREA: 18.176 Acres of which 3.87 acres is dedicated park land,
41 lots.
REQUEST: Approval of a preliminary plat.
APPLICANT: Matthews Investments Goodwin & Marshall, Inc.
(Developer) (Engineers)
Mr. Tim house Mr. Matt Goodwin
5220 Spring Valley Rd. 6001 Bridge Street
Suite #500 Suite #100
Dallas, Texas 75240 Ft. Worth, Texas 76112
(214) 934-0123 (817) 429-4373 (Metro)
HISTORY: This parcel has not had any recent subdivision activity,
although there has been considerable zoning work (see
History under Big Cedar zoning case #PD-119).
TRANSPORTATION:
Bethel School Road has been recommended to be down graded
from a two-lane undivided 65' right-of-way collector
thoroughfare to a residential dead-end street contained
within a 50' right-of-way, provided zoning on both sides is
residential. There is also a proposal to rename the street
to Harris.
SURROUNDING LAND USE & ZONING:
North - single-family residential; (PD-SF-9) zoning
South - undeveloped sparsely developed residential;
(C) Commercial zoning
East - undeveloped; (C) Commercial zoning
West - single-family & vacant; (PD-SF-9) & (SF-9) zoning
ITEM 14
COMPREHENSIVE PLAN:
The plan calls for low density, sin§le-family development
ANALYSIS: Because staff has such reservations with the Planned
Development request which proceeds this plat, staff
recommends denial of this subdivision at the current time.
Once our PD concerns have been addressed, the plat can be
reconsidered. Several concerns which surfaced durin§ our
review include lack of alleys, flood plain resolution,
access a§reements, location of roads, set backs, side
yards, etc. By denyin§ the plat at this time, those
concerns can be properly addressed and resolved, hopefully
by the October public hearin§.
ALTERNATIVES: 1) Approve the preliminary plat 2) Deny the preliminary plat
3) Modify the preliminary plat
ATTAC~MENTS: 1) Subdivision Plat
2) September 4 letter from applicant's en§ineer
BIGCEDAR.STF
CIVIL EN~,INf'FR$ '-- ~L~NNI=R$ ,-, SLIRVE¥OR$
September 4, 1991 ~V~, ,~. (~ [~ 0 ~'._-'7 ..... ...
Ms. Taryon Bowman
Planning and Zoning Coordinator
City of Coppell
i
255 Parkway Boulevard
Coppell, Texas 75019
RE: Preliminary Plat, Preliminary Engineering Plans and PD Zoning Site Plan for the Proposed
Big Cedar Addition to the City of Coppell
Dear Shohre:
Enclosed please find two (2) copies of the above referenced plat, plans and zoning site plan for the
proposed Big Cedar Addition to the City of Coppell. Please note that the items have been revised
per Development Review Committee comments. The following are specific items that I feel require
addressing in regards to the DRC comments:
P~L~~YP~T
1) We are still showing the right of way of Harris Road (Bethel School Road) as fifty (50) feet.
This requires an additional 7.5 foot dedication from the subject property. As you are aware,
Mr. Tim House of Matthews Southwest Investments has been negotiating with the landowner
across Harris Road as well as the City of Coppell as to the issues inherent to the improve-
ments of Harris Road. Engineering documentation is being prepared by others to address this
issue. It is my understanding that this documentation will be presented to the City within the
next few days.
2) The ten (10) inch sewer line that traverses the property is not contained within any dedicated
public easement. For this reason, no easement is currently shown as existing on the
Preliminary Plat.
3) The twenty (20) foot private access casement across Lot 1 has been previously agreed to with
the McDowell family.
4) We are formally requesting a variance from the City requirement for alleys on this project.
This has been duly noted on the Preliminary Plat as well as the PD Zoning Site Plan.
5) We are currently in the process of determining our desire to access the park. This issue will
be addressed prior to filing a Final Plat. If we do decide to access the park, we will plat a
suitable easement between lots adjacent to the proposed park dedication.
6001 BRIDGE STReet, SUite 100 / FORT WORTH. Texas 76112 / 817-429-4373 (Metro}
Big Cedar Addition
September 4, 1991
Page 2 of 3
PRELIMINARY DRAINAGE LAYOUT
1) We intend to design proper erosion control devices at the outlet of the proposed storm drain
pipe to serve the property. This issue will be handled during the final design phase of the
project.
2) As you are aware, we have proposed a reclamation project for this region. The City has
accepted the project and forwarded a flood study to FEMA for review. The DRC comment
requesting information on the proposed plan of improvements for the creek area in relation
to the Albert Halff study must have been made by someone outside the loop on this issue.
If any questions remain, please call.
3) The flood study discussed in (2) above clearly shows that minimal impact of the reclamation
project is experienced at the proposed park location.
4) Area A5 as shown on the preliminary drainage layout is expected to be picked up in the future
Harris Road storm drain system. If there is a timing problem for the two projects, we will
accommodate the runoff through the concrete flume as shown.
5) We are proposing that the drainage easements be fifteen (15) feet in width. A twenty foot
easement would actually encompass more area than the side setbacks for the lots. We feel
that the fifteen foot width provides adequate access to the storm drain system.
6) We have included a watershed area map of the drainage basin clearly indicating the project
location.
PRELIMINARY WATER AND SEWER LAYOUT
1) We agree to show a 15 inch sewer line through the project as called for under the recently
completed sewer master plan. However, we feel that the over sizing of this line should be cost
shared by the City. Please advise as to how you wish us to proceed with this request.
2) The proposed sanitary sewer between lot 8 and lot 9 will be offset within the easement so that
the manhole can be accessed from one lot, i.e. no fence will cover the manhole lid.
3) The actual configuration of the connection to the existing sewer near the south property line
of lot 8 and lot 9 will be designed for the best possible connection angle. The complicating
factor in this situation is that an existing aerial crossing is in this location. During the design
process we will work with the City to establish the best possible situation given the existing
configuration in this location. For the purposes of this preliminary submittal, we have not
changed the configuration as originally submitted.
4) I have not included the fire hydrant at the intersection of Harris Road and proposed Brock
Street (Street "A"). All lots within this region are well within 500 feet of an existing or
proposed fire hydrant.
Big Cedar Addition
September 4, 1991
Page 3 of 3
5) Rather than add the fire hydrant at the end of Leigh Street (Street "C"), we have moved the
proposed hydrant near the intersection of Leigh Street and Brock Street to a location that
places all lots within 500 feet of the hydrant. Please contact me if either item (4) or (5) as
indicated are a cause of problem to you. These issues can be worked out during the design
of final engineering plans for the project.
As a courtesy Mr. Tim House is contact the McDowell family regarding the change in street name
to Harris Road. We feel that the City should also provide official notification of the name change
as well.
I feel that this letter, together with the changes made on the revised preliminary plat and plans
attached, address the concerns expressed by City Staff on this project. Please feel free to call me if
there are any additional comments.
As always, I appreciate your assistance in this matter.
Sincerely,
D. Matthew Goodwin, P.E.
DMG/jc
cc: Ms. Shohre Daneshmand, P.E.
Mr. Tim House
Mr. Fred Joyce
Ms. Mary Myers
Item 12 Consideration and approval of a preliminary plat request for Big Cedar Addition,
on property located along the west side of Bethel School Road and approximately
400' north of Bethel Road, at the request of Matthews S.W. Investments.
Mayor Pro Tem Smothermon moved to approve the preliminary plat request for Big Cedar
Addition, on property located along the west side of Bethel School Road and approximately 400'
north of Bethel road with the same conditions as in Item 11. Councilman Robertson seconded
the motion. The motion carried 7-0 with Mayor Pro Tem Smothermon and Councilmen
Weaver, Thomas, Morton, Cowman, Robertson and Nelson voting in favor of the motion.
Item 13 PUBLIC HEARING: Consideration and approval of a request to vacate the
previously fried and executed final plat of Waterside Estates, Phase I, on property
located along the south side of Parkway Boulevard, west of MacArthur
Boulevard, and the request of Albert Halff and Associates, Inc.
Planning and Community Services Director Gary Sieb gave a presentation to Council. Randy
Lockhart, representing the prospective purchaser, was also present to address Council. Mayor
Wolfe declared the Public Hearing open and asked if there were any persons who wished to
speak in favor of or in opposition to vacating the previously filed and executed final plat of
Waterside Estates, Phase I. There being no persons who wished to speak, Mayor Wolfe
declared the Public Hearing closed. Councilman Robertson moved to approve vacating the
previously filed and executed final plat of Waterside Estates, Phase I, on property located along
the south side of Parkway Boulevard, west of MacArthur Boulevard. Mayor Pro Tern
Smothermon seconded the motion. The motion carried 7-0 with Mayor Pro Tem Smothermon
and Councilmen Weaver, Thomas, Morton, Cowman, Robertson and Nelson voting in favor of
the motion.
Item 14 Consideration and approval of a final plat request for Waterside Estates, Phase
I, on property located along the south side of Parkway Boulevard, west of
MacArthur Boulevard, at the request of Albert Halff and Associates, Inc.
Planning and Community Services Director Gary Sieb made a presentation to Council.
Councilman Weaver moved to approve the final plat request for Waterside Estates, Phase I, on
property located along the south side of Parkway Boulevard, west of MacArthur Boulevard, at
the request of Albert Halff and Associates, Inc. with the condition that a drainage easement be
shown on the face of the plat prior to the Mayor's signature on the plat. Councilman Robertson
seconded the motion. Council requested that documentation for an easement be provided to
Council prior to council meetings. The motion carried 7-0 with Mayor Pro Tem Smothermon
and Councilmen Weaver, Thomas, Morton, Cowman, Robertson and Nelson voting in favor of
the motion.
Item 15 PUBLIC HEARING: Consideration and approval of a zoning change request,
Case #PD-120 (Waterside Estates, Phase II), from (SF-9) Single-Family-9, to
(PD-SF-9) Planned Development Single-Family-9, on property located along the
north side of Parkway Boulevard, and along the west side of MacArthur
Boulevard.
Planning and Community Services Director Gary Sieb made a presentation to Council. Bill
Anderson with Dan Dowdey & Associates was also present to answer any questions which
Council might have. Mike Redding of Standard Pacific Homes informed Council that they will
be the developer and builder of this property. He stated that the sales office will inform the
buyers of the dues at the current amount of 26 cents per $ I00 home evaluation to be paid to the
Homeowners Association. Council noted that disclosure of the dues for Homeowners
Associations had been hard to decipher and requested that a simple form of disclosure be drawn
up to ensure that the prospective homeowner would be aware of the existing association and the
dues which would have to be paid to it. Mayor Wolfe declared the Public Hearing open and
asked if there were any persons who wished to speak in favor of or in opposition to the zoning
B) Lindy Thomas, Chairman of the Coppell Historic District Committee, of 503 Parkview
Place, stated that the Coppell Historic District Committee is supportive of this park construction.
Larry Wheeler, Park Board Chairman, reported that the Park Board feels that this park is a
significant project with historical value and that they are in agreement with the proposed project.
Mayor Pro Tern Smothermon moved to approve the agreement with Dallas County, which would
involve Coppell's release of its present dedication, leasing it back from the County, and
executing the necessary documents from the Baptist Foundation to accomplish that. Councilman
Cowman seconded the motion. The motion carded 7-0 with Mayor Pro Tem Smothermon and
Councilmen Weaver, Thomas, Morton, Cowman, Robertson and Nelson voting in favor of the
motion.
Item 11 PUBLIC HEARING: Consideration and approval of a zoning change request,
Case #PD-119 (Big Cedar Addition), from (SF-9) Single-Family-9, to (PD-SF-9)
Planned Development Single-Family-9, on property located along the west side
of Bethel School Road and approximately 400' north of Bethel Road, at the
request of Matthews $.W. Investments.
Planning and Community Services Director Gary Sieb made a presentation to Council. Tim
House of 400 Parkview, Coppell, representing Matthews Southwest along with the existing
owners Mary Stone Myers and Fred ~Ioyce made a presentation to Council. He stated that a
variance is being requested on lots 3-5, reducing the front setback by three feet, a side yard
variance on 14 lots and relief from the alley provision on five lots on Harris Drive. Mayor
Wolfe declared the Public Hearing open and asked if there were any citizens who wished to
speak in favor of or in opposition to the proposed zoning change. Those citizens who wished
to speak included: 1) Clay Pearson of 428 Dillard, President of the Hunterwood Homeowners
Association stated that he was speaking on behalf of the executive committee of the homeowners
association. He related that the committee is in favor of the zoning change, with the exception
of the alley access to the five properties on Harris Avenue. 2) Ray McDowell, representing
his mother who lives at 239 Harris stated that he is in favor of the zoning change. There being
no other persons who wished to speak, the Public Hearing was closed. Following discussion
of the potential drainage problems, Staff was asked to look at the easements which might be
needed to correct any future problems, working with the applicant to see what impact they would
have on any existing trees and what other possible solutions there might be. Councilman
Weaver moved to approve the zoning change request, Case ~'PD-119 (Big Cedar Addition) from
(SF-9) Single-Family-9, to (PD-SF-9) Planned Development Single-Family-9, on property
located along the west side of Bethel School Road and approximately 400' north of Bethel Road,
at the request of Matthews S.W. Investments with the following conditions: I) deletion of the
alley; 2) developer complete a nature pathway from the end of the access easement to Anderson
Park; 3) additional easement for 10' drainage behind lots 16, 17, 18 and 19 of Block A be
addressed prior to final plat; 4) that the developer limit the number of exceptions to the side
yard setback to 14 lots; 5) an entry monument sign and landscaping be in place; 6) the access
easement have a sidewalk and landscaping; 7) a tree survey be provided for the development;
and, 8) lots 3 - 5 be allowed a 22 foot front setback. Councilman Robertson seconded the
motion. The motion carried 7-0 with Mayor Pro Tern Smothermon and Councilmen Weaver,
Thomas, Morton, Cowman, Robertson and Nelson voting in favor of the motion. Councilman
Morton moved to amend the motion to include the conditions that the entry monument equal or
exceed the one for Creekside and that the Harris Road setback be 30' and that there be
landscaping and irrigation with two 4" trees per lot, and with the cost of the nature trail not to
exceed $7,500. Mayor Pro Tern Smothermon seconded the motion. The amendment motion
carried 6-1 with Mayor Pro Tern Smothermon and Councilmen Thomas, Morton, Cowman,.
Robertson and Nelson voting in favor of the motion and Councilman Weaver voting in
opposition to the motion.
''~i-· : '"- :"?'"~"-¥" ~ ''~'~'
.. : ..... ~_:,, _~ -
.-.-... .~... .. . ... ..... ..,. :~ -. :.7,~:~.~:.::~. -
. . :- -: :.- - ..,. :'.::~.~.-..~.~-.~.
.... ' 5'*- ~ T~ .
.~ '. .... ;'; ;: 75~~':.