Carter Add P2/PP-DR 960926 (6) TUELECTRIC ' '
Comments for the City of Coppell
Development Review Committee
(_/Preliminary/~ 'Plat is~ acceptable.
9-26-96
Easements will 'be required for proposed electric facilities.
A plat with easement requirements will be provided to the
developer.
Load information (size of structure, A/C /
Heat
Load)
will
be required from the developer before easements can be
determined.
Please call me at {~-4--888-1307 if you have any questions.
Tim Brancheau
14400 Josey Lane Farmers Branch, Texas 75234