Loading...
Chautaugua Pl/FP-CS 911223SHIMEK, JACOBS & FINKLEA CONSULTING ENGINEERS 8333 Douglas Avenue, #820 Dallas, Texas 75225 (214) 361-7900 ROSS L. JACOBS, RE. I. C. FINKLEA, P.E. JAMES E. LAUGHLIN, P.E. RONALD V. CONWAY, P.E. JOHN W. BIRKHOFF, P.E. MATT ARMSTRONG, P.E. JOE R. CARTER, P.E. GARY C. HENDRICKS, RE. C.L. SHIMEK, P.E. December 23, 1991 Mr. Kenneth/Mi Griffin, P.E. City E~g~eer. City o/f/Coppell Pos~ffice Box 478 )~pell, Texas 75019-0478 Re: Chautauqua Place Final Plat and Construction Plans 2nd Review Dear Mr. Griffin: We have reviewed the 2nd submittal of the final plat and construction plans for the Chautauqua Place Addition to the City of Coppell prepared by Nathan D. Maier Consulting Engineers, Inc. for Mathews Investment Southwest, Inc. The final plat has been revised in accordance with our previous review comments and is now in general conformance with the City's Subdivision Regulations. However, the issue of the Harris Road ultimate right-of-way width has yet to be resolved. We recommend this plat go forward for City Council approval with the issue of the Harris Road Right-of-Way being determined as the Harris Road construction plans are submitted and reviewed. If additional right-of-way is required, the plat could be revised prior to filing, or if necessary, Lot 1, Block A could be submitted for replat. We have noted several items in the construction plans which require correction prior to final acceptance. Our comments are detailed on the attached Final Plat Checklist and on the marked up construction plans. Of particular concern is the storm drainage system for this addition. As we have previously indicated, if the sag inlets fail either on Dakota Lane or Bethel School Road, storm water could pond up as deep as 18 inches in the street at each of these locations. However, it appears the finish floor elevations are at least a foot above this anticipated water surface. In addition, the design of this storm sewer system should be coordinated with the improvements to Harris Road and Bethel School Road. It appears the storm sewer outfall channel from Harris Road to Stream G2A, as indicated in the City Wide Storm Water Management Study, will require an off-site easement. Mr. Kenneth M. Griffin, P.E. City of Coppell December 23, 1991 Page No. 2 We have calculated the preliminary development fees for this addition and are enclosing a draft letter for your use. We are also enclosing a copy of the Development Fee list and calculations for your files. Please forward our review comments along with the marked up construction plans to Public Works, DRC Members for their review and comment. We are available to discuss this project further at your convenience, j Gary C. Hendricks, P.E. Enclosures cc: Public Works, DRC Members ~,~¥on Bowman, P&Z Coordinator M. Shohre Daneshmand, P.E. Nathan D. Maier, Inc. Date: December 23~ 1991 Review of the Chautauqua Place Subdivision for conformance with the Subdivision Ordinance of the City of Coppell, Texas. 2nd Review FINAL PLAT & COHSTRUCTION PLANS Item I I ! I I__ I- I I I I I ITransmittal Letter & Payment of Fees I ! IScale Subdivision Name I I ~Name and Address of Developer Boundary Lines Existing Streets: Location Width Subdivision Location Subdivision Layout: a) Street Names b) Right-of-Way Calls c) Easement Calls d) Lot Layout Numbers Dimensions & Bearings Corner Monuments Public Use Dedications Homeowner's Association Dedications IBuildinq Setback Lines ! I IPrivate Restrictions ! I INorth Arrowr Scale & Date I ! ,'Surveyor's Certification ! I lOwner's Certification IAdditional Certifications: ' Public Utility C~m?anies ICity Approval Signature Block I- :Section of: ~Ordinance ~Item Shown IX-B IX-C. 1. IX-C. 2. IX-C. 3. IX-C. 3. IX-C. 4. IX-C. 5. Yes Yes Yes Yes Yes Yes In Confor,,,~nce No Yes Yes Yes Yes IX-C. 6. IX-C.7. IX-C.7. IX-C. 8. IX-C.9. Yes Yes I Yes Yes Yes I Yes ' Yes I I ~ Yes Yes ~ ! ! ' Yes Yes ~ Yes I Yes Yes Yes Yes Yes Yes I ! No I Yes Yes Yes No Yes Yes I , ! ! Yes ' Yes I IX-C. 10. ! ! IX-C. 11 Yes ' Yes · [ I I Yes ' Yes ! ! Yes ' Yes I IX-C.12. IX-C.13.t IX-C. 14. Yes ~ Yes ! I Comments ' ! ! See attached Prelim. Fee Sched See Note 1 I I I I I I ',see Note 2 FINAL PLAT (Page 1 of 2) I ! I I Item I I I I, Pa%anent of Taxes Easement/R.O.W. Agreements Construction Plans: a) Water Distribution b) Sanitary Sewer c) Paving d) Drainage Landscape Plan :Section of: ', In :Ordinance :Item Shown:Conformance ! I I I I I I I I IX-C. 15. ii i · I IX-C. 16 I ' IX-C.17. IX-C.18. IX-C. 19. I I I I I I No I ! Yes i No Yes I i No Yes ~ No Yes i No bio I I I · I I ' No Building Area & Parking {Non-Residential Only) IHomeowner's Association Agreement IX-C.20. C~m-ents ? Not Provided See Note 2 See Markups See Markups See Markups iSee Markups Not Provided Not Provided 1. Lots 15-20, Block A have frontage on both Kay Street and Dakota Lane. Improvements to Harris Road should be included in these plans. This addition, the Big Cedar Addition and the existing ~illages of Coppell Addition would all be better served with a 60-foot wide right-of-way on Harris Road and 37' back-to-back pavement from the existing Harris Road pavement south to Brooks Lane. 3. Standard construction details have not been provided. FINAL PLAT (Page 2 of 2)