Chautaugua Pl/FP-CS 911203SHIMEK, JACOBS & FINKLEA
CONSULTING ENGINEERS
8333 Douglas Avenue, #820
ROSS L. JACOBS, P.E.
I. C. FINKLEA, P.E.
JAMES E. LAUGHLIN, RE.
RONALD V. CONWAY, RE. //~
JOHN W. BIRKHOFF, P.E.
MATT ARMSTRONG, RE.
IOE R. CARTER, RE. //'
GARY C. HENDRICKS, RE. /
C. L. SHIMEK, RE.
Ms. M. Sho/re Daneshmand, P.E.
Enginee_r~hg D_e_partment
City o~/Coppell
Post/~ffice Box 478
CJel~, Texas 7~019-0478
~e: Chautauqua Place
Final Plat & Construction Plans
1st Review
Dallas, Texas 75225
December 3, 1991
(~14) 361-7900
Dear Ms. Daneshmand:
We have reviewed the final plat & construction plans for the Chautauqua Place
Addition to the City of Coppell prepared by Nathan D. Maier Consulting
Engineers, Inc. for Matthews Investments Southwest, Inc. The final plat and
plans have been prepared in general conformance with the City's Subdivision
Regulations. However, we have noted several items in need of correction prior
to final acceptance. Our comments are detailed on the attached Final Plat
Checklist, the City of Coppell Engineering Department Checklist and on the
marked up construction plans.
We will calculate the preliminary development fees for this addition and
provide you with a draft letter once we have received the Street Sign
Assessment from Public Works. We are enclosing a Rough Draft of the
Development Fee List and preliminary calculations for your files.
Please forward our review comments along with the marked up construction plans
to the Public Works DRC Members for their review and comment.
We are available to discuss this project further at your convenience.
i~~~icks,
P.E.
Enclosure
P~F/ic Works, DRC Members
CC:
%/~'aryon" Bowman, P&Z Coordinator
Nathan D. Maier, Inc.
Date: December 3~ 1991
Review of the Chautauqua Place
Subdivision Ordinance of the City of Coppell, Texas.
FINAL PLAT & CONSTRUCTION PLANS
Subdivision for conformance with the
Item
Section of
Ordinance
,' In
~ItemShown~Confor-~.ce
Yes
Transmittal Letter & Payment of Fees IX-B
!
!
~ Yes
Scale I i
!
Subdivision Name
Nam~ and Address of Developer
IX-C. 1.
IX-C. 2.
IX-C. 3.
IX-C. 3.
Boundary Lines
Existing Streets:
Location
Width
Subdivision Location
Subdivision Layout:
a) Street Names
b) Right-of-Way Calls
c) Easement Calls
d) Lot Layout
Numbers
Dimensions & Bearings
Corner Monuments
Public Use Dedications
Yes
Yes
Yes
Yes
Yes
Yes
Yes
IX-C.4.
IX-C. 5.
Yes
IX-C. 6.
IX-C. 7.
IX-C. 7.
IX-C. 8.
IX-C. 9..
Yes
Yes
Yes
Yes
Yes
Yes
IX-C. 10.
No
Yes
Yes
Yes
Yes
Yes
Yes
Cu~nts
Yes
See attached
Prelim. Fee Sched
I
I
I
I
I
I
Yes '
I
I
!
Yes '
I
I
I
Yes '
!
No IAdd Dimensions
!
!
No ISee Note 1
!
Yes !
No
!
!
ISee Note 3
Homeowner's Association Dedications
Buila~ng Setback Lines
Private Restrictions
North Arrow~ Scale & Date
IX-C. 11.
!
!
IX-C. 12
·
IX-C. 13
·
IX-C. 14 '!
·
Add. Bearing
calls required
t No
I
I !
Yes ' No ISee Note 2
I
I
!
Yes ! Yes
! !
! !
' '
I !
! !
! !
Yes ' Yes '
I
I
i Yes
Yes I
I
!
' Yes
Yes I
No
Yes
Not Shown
,,!
ISurve¥or's Certification
I
I
IOwner' s Certification
IAdditional Certifications:
Public Utility Companies
!
:City Approval Signature Block
I
I
I
I
I
I
I
.I
I
I
I
I
I
I
!
I
NO
Yes
FINAL PLAT & CONSTRUCTION PLANS (Page 1 of 2)
!
!
I
I
I
I
I
I Pa%ament of Taxes
Easement/R.O.W. Agreements
Construction Plans:
a) Water Distribution
b) Sanitary Sewer
c) Paving
d) Drainage
.Landscape Plan
Building Area & Parking
(Non-Residential Only)
IHomeowner's Association Agreement
:Section of
~Ordinance
I
I
I
I IX-C.15
~ ·
!
!
~ IX-C. 16
I °
i In
! I
Item
No
L No
' IX-C. 17
! -
!
!
!
!
I
I
I
I
I
I
I
I
I
I
I
I
I
Yes ' No
i No
Yes I
I ' Yes ! No
! ~ Yes ! No
! !
! !
IX-C.18.I No Ii No
! !
! !
IX-C. 19. I !,
, !
! !
!
IX-C.20.1 No !! No
~nents
No Not Provided
No See Note 3
See markups
See markups
See markups
See markups
Not Provided
Not Provided
I
1. Lots 15-20, Block A have frontage on both Kay Street and Dakota Lane.
0
Landscape and sign island in Bethal School Road needs to be identified as a common area
to be maintained by Homeowner's Association. Dimensions of island should be indicated
on the plat.
Improvements to Harris Road should be included in these plans. This addition, the Big
Cedar Addition and the existing Villages of Coppell Addition would all be better served
with a 60-foot wide right-of-way on Harris Road and 37' back-to-back pavement from the
existing Harris Road pavement south to Brooks Lane.
4. Standard construction details have not been provided.
FINAL PLAT & CONSTRUCTION PLANS (Page 2 of 2)
DRC DATE8
REVIEW OF~
CITY OF COPPELL
PUBLIC WORKS
ENGINEERING DIVISION
BYz
FINAL PLAT AND pLANS~
A. Please make the following
final plat as marked~
3)
4)
?)
additions and/or corrections on
Name of the proposed subdivision must be consistent on
the plat and all pages of the construction plans, etc.
Location . . . width . . . and the name of all existing
or recorded streets intersecting the boundary of the
tract.
Delineate the existing and proposed zoning of the site
and the surrounding properties.
The accurate outline of all property which is offered for
dedication for public use with the purpose indicated
there on. Fire lanes must be shown on final plats.
Certification by a registered Public Surveyor to the
effect that the plat represents a survey made by h~m.
Delineate utility signature block on the final plat.
Per FloodplainManagement Ordinance %87390 (Art. 5, Sec.
C, Item4, Page 34), all subdivision proposals must have
the following note placed on the preliminary and final
plats~
'Floodplain Development Permit Application No.
has been filed with. the City of Coppell Floodplain
Administrator, on , 19 .#
(Floodplain Administrator)
No Comment.
Page 1/3
(Date)
Be
l)
2)
3')
4)
5)
e)
'7)
8)
The following information, as marked, is required to be
contained in the final construction plans of the above
proJect~
- Provide final construction plans, simultaneously 'with
final plat submittal. Final plans must have a cover
sheet, detailed design plans, and standard detail sheets.
A cover sheet, for final construction plans shall include
the followingz
* Name of the project
* Owner's name and address
* Engineer's name and address
* Architect's name and address
* Vicinity map
*~-J~dex list, covering all ~ages'include~ in the set
*~___~'PlanApproval ParagrapA', see attacaea~
Detailed final construction plans shall contain the
followingz
* Ail required street paving plans and profile sheets.
* .Ail required 8tormdrainage plans and profile sheets.
* All required alley paving plans and profile sheets.
* A complete and accurate drainage area map and
detail grading plan.
* All required letters of permision from adjacent
property owners.
* Ail required water and sewer engineering plans.
- Provide barricading plans.
Provide trench safety, sealed by a registered engineer
in the State of Texas.
Delineate proposed an~sting we~distribution system
and pipe sizes.
Delineate proposed and existing sewage collection system
and pipe sizes
- Provide a Drainage Area Map covering two partsz
a) show On-site Drainage Map, on a scale of 1' ~ 20',
40'. 50' etc... ' with all details as required in
the Subdivision Ordinance;
b) show the Off-site Drainage Map, on a scale 1' ~ 100',
200', .etc. Delineate the project's boundary on
it, plus the ~e~s detalled drainage system, to clearly
demonstrate the affect of such activities, drainage
outfalls, on the adjacent properties and the Drainage
Master Plan.
9)
xo)
ll)
1.3 )
l?)
all storm 8ewer systems must be designed for 100-year
design frequency. Technical Paper 40 should be used to
compute rainfall intensities, as per the Subdivision
Ordinance, (Appendix "A', Page 30).
Show the hydraulic calculations for each portion of the
storm system on the profile, such as pipe size, Q100
(cfs), Qc (cfs), S, v (FPS) etc. . .
All lots within or adjacent to the 100-year Floodplain
shall have the lowest floor elevation for each building
site shown on the site grading plans.
A'permanent bench mark must be established with in a
subdivision development, see attached Floodplain
Development checklist. ..
Each sheet of the plans shall contain a title block and
consistent page numbers.
Ail appropriate fees as per subdivision ordinance must
be paid.
Delineate a Revision block on each sheet. Revision
dates must be shown on each sheet with Engineer's
initials next to them.
All above comments must be addressed, prior to Staff's
recommendation for approval of the final plat and plans.
Provide a wrltten response on all conments with
explanations provided on items not addressed as
requested above.
DRC/COMMENTS/ENG/FINAL
SD/bb
Page 3/3
PLA~ APPROVAL PARAGRAPH
For Ci£y Engineg~
P.b:t~ P,,tepaaed b~
Shee. Z ot
L~: Revi6ion da~e
RE.'
RE':
Spe~i~ica~io~ Paepa~ed by
Shee~ . o{ ~ La~£ Rcvl~ion da~e
E,6 p,Mo.,t~o n d~te
The above Zden~ied plax and spec~ica.~on~ have beea ~eui~ ~ ~o~
to be ~ comp~nce ~k ~fle ~pp~b~e Engine~g ~ov~io~ o~ ~fle ~p~
Code o~ ~he C~ o~ Copp~, Te~. l~s~nce o~ t~ app~ov~ ~fl~ no~ be
co~ed ~ ~pprou~ o~ ~fle concep~ to;t ~he co~~on d~ ot ~fle ~opo~ed
~paou~e~ ~d afl~ no~ ~ eny ~a~ a~e ~fle ~n~/Deu~op~ and
~ ~he above ipeMtZ~ do~.
The ~uance o6 ~ appaov~ do~ no~ a~flo~ze co~~n, ~ co~u~on
afl~ .oZ pao~eed a~ Zfle ~n~t fl~ ei~e~ comp~nce ~k ~ o~k~ app~b~e
~ou~go~ ol :fie ~a~~ Code o{ ~fle C~F ol Copp~, T~ ~d comp~a~ce
ol ~ oltt~ i~e i~~, and aeg~o~ aeq~~ app~ble :o
~ou~e~ ~pe~i~ in ~fle ~e~i~ doc~e~, ~a~g com~o~
o~ ~e P~n~ng and Zo~g Com~io~ ~nd C~ Coun~ p~ o~ ~ ~e~,
po~g ol ~ bon~ ~d ~hen ~e~n9 an "Appaov~ Eo Paoce~" laom Eke C~E
Eng~e~t.
~ ~fle C~ Engineer. Ai~t ~he Oev~op~t'~ O~ign Eng~e~ ~pp~tou~ ~he
change, the e~'~ ~ign~ Eng~e~g l~pe~o~ ~ be co~ed milo
m~ ~tk~ appaove ~d/oa ~ec~e ~ppaov~ ~om ~e C~ Eng~e~, ~
~e a ~uppl~~ P~ ~ppaoved m~ be ~i~ed to ~fle ~proved p~, and
~ITV EHGIHEER DATE
~I~ OF (X)ppt~,n
KI~~ DKP~
FOR
Park Foe
50% payable prior to Council Approval
50% payable with Building Permit
Water Impact Fee
100% due prior to Council Approval
#ater Tap Inspection Fee
100% due at Issuance of Building Permit
100% ~e at Issuance of Building Pe~it
Street Sign Fee
100% due prior to Council Approval
Street Light Fee
100% due prior to Council Approval
Construction Inspection Fee
100% due prior to Council Approval
(Base~ upon 2% of project construction
cost to be provided by the Developer's
Engineer )
~sessment
$.-&rl-e~. oo
b t~,o5O
Yotal ~ount Due Prior to Council Appz~wal:
Amount Due Prior
to Council Approval
· 13, OKO
Nor Co.fl6 ·
$47,829.36
$47,829.36
Plus 2% Construction
Inspection Fee
This fee cannot be assessed until after TU Electric submits the lighting plan for the
proposed project. Once the plan is submitted, $292.60 per light will be assessed.
Note: This project is BOTwithin the Coppell Municipal Utility District No. 1. Therefore,
the Wastewater Impact Fee is due prior to council Approval.