Loading...
Burch Add L4/FP-AG 950613Thm 4:~ v~qth ^ ~maotifut Futura CITY COUNCIL ~EETING: AGENDA REQ ST FORM ~une 13~ 1995 ITEM CAPTION: Consideration and approval of The Burch Addition, Lot 4, Block "A", Final Plat, to allow development of an orthodontics clinic on property located at the west side of Denton Tap Road, approx~ately 535 feet~. south of Bethel School Road. AP~D~)~'~/~ !i~ ~.~/~ ~ ~ C TY Gary L. Sieb DATE "---- Director of Planning & Community Services SUBMITTED BY: TITLE: STAFF COMMENTS: INITIALS ~5 Date of P&Z Meetinq: May 18, 1995 Decision of Commission: Approved (4-2) with Commissioners Lowry, Wheeler, Redford, and Reyher voting in favor. Commissioners Thompson and Stewart opposed. A vacancy exists at the present time. STAFF RECOMMENDATION EXPLANATION: Approval Please see attached for conditions. Denial BUDGET AMT.$~/~ FINANCIAL COMMENTS: AMT. EST.$ +/- BUD:$ FINANCIAL REVIEW: ~ Agenda Request Form - Revised 1/94 Put ",,oklc.~cl' t~,x~ ia pti~t ~ CITY MANAGER REVIEW:~ / AGENDA REQUEST NARRATIVE BURCH ADDITION, LOT 4, BLOCK "A" (ORTHODONTICS CLINIC) Conditions for approval: Provision of an easement for overhead electric utilities, as described previously, and subject to City Council approval of a variance of the requirements of Appendix C Section of the Subdivision Ordinance, and revision of the site plan and landscape plan to show sewer easement on the north side of the lot as a 20'-wide easement, on- site utility locations, fire hydrant easement and 15'-wide utility easement as recommended by the Engineering Department. Agenda Narrative - Revised 1/94 Sp~HChe. ck and Save Dcxamm~ ~ ~r to attach narrative to ¢n4ginal Agm~da II~n~t. ~ CITY OF COPPELL PLANNING DEPARTMENT STAFF REPORT CASE: BURCH ADDITION, LOT 4, BLOCK A, (ORTHODONTICS CLINIC) FINAL PLAT P & Z HEARING DATE: May 18, 1995 C.C. HEARING DATE: June 13, 1995 LOCATION: West side of Denton Tap, approx. 535 feet south of Bethel School Rd. SIZE OF AREA: 1.251 acres CURRENT ZONING: C (Commercial) Approval of a final plat APPLICANT: Frank J. Stich HI, DDS, MSD (Owner) 580 $. Denton Tap Rd.,//220 Coppell, TX 75019 (214) 462-7892 Michael Dowdey Dowdey, Anderson & Associates, Inc. (Engineer) 16250 Dallas Parkway, #100 Dallas, TX 75248 (214) 931-0694 HISTORY: The Planning and Zoning Commission approved a preliminary plat for Burch Addition on July 21, 1994, with 8 conditions. On August 9, 1994, the City Council approved the preliminary plat with 4 conditions: 1) execution of a property owner's agreement to maintain landscaping, 2) provision of a utility layout, 3) construction of left-mm lane and driveway across common access easement prior to a Certificate of Occupancy on either Lot 1, 3 or 4, 4) establishment of a development line on the west side of the utility easement for the proposed sewer line. TRANSPORTATION: Denton Tap Road is a P6D, six-lane divided thoroughfare built to standard in a 100 foot r.o.w. Item 11 SURROUNDING LAND USE & ZONING: North- commercial; C South- vacant; C East commercial; C West- single-family; SF-12 COMPREHENSIVE PLAN: The 1987 Plan showed retail. DISCUSSION: The use of a light blond to rust "layered" flagstone or sandstone on the proposed building and monument sign is compatible with certain other features in the vicinity, such as the entrance monument at Creek View, the planter around the sign at Denton Tap Office Plaza, and the planters and retaining walls at the offices on each side of Meadowcreek Drive. The Subdivision Ordinance provides that, where conditions do not warrant underground utilities, the use of overhead wiring may be considered if the services are on the rear property line. Texas Utilities needs to serve the property from overhead lines located on the east side of Denton Tap Road. They have agreed to place a pole 100 feet west of the front property line, extend an overhead line across Denton Tap Road to that pole, and thereby eliminate the need for any additional poles along the road. At the time of preliminary plat approval, Wes Burch agreed to provide a 20'-wide hike-and-bike trail easement. On Lots 2 and 3 it adjoins the west side of a 20'-wide sanitary sewer easement which parallels the creek. Dr. Stich does not want the trail to parallel the creek on his property. He proposes that it follow his north property line to the street and parallel the street southward from that point. The siting of the proposed building has taken into careful consideration the location of numerous trees worthy of preservation. To locate the trail alongside the creek, without changing the proposed building location, requires that a 48'-long section of the trail cross the flood plain via a foot bridge. The placement of the trail between the building and the creek does not interfere with the view of the creek from the building. Placement of the building between the trail and the creek denies the public a view of the creek. RECOMMENDATIONS: Staff recommends approval of the Final Plat with the following three conditions: 1. Provision of an easement for overhead electric utilities, as described previously, and subject to City Council approval of a variance of the requirements of Appendix C Section 5 of the Subdivision Ordinance. Item 11 2. Placement of the 20'-wide hike-and-bike trail easement alongside the flood plain, with an approximately 50'-long segment partially within the flood plain. 3. Revision of the site plan and landscape plan to show sewer easement on the north side of the lot as a 20'-wide easement, on-site utility locations, fire hydrant easement and 15'- wide utility easement as recommended by the Engineering Department. ALTERNATIVES: 1) Approve the final plat 2) Disapprove the final plat 3) Modify the final plat ATrACHMENTS: 1) Final Plat 2) Site Plan 3) Landscape Plan 4) Irrigation Plan 5) A letter from the applicant 6) Engineering Comments Item 11 DEVELOPMENT REVIEW COMMITTEE - _ ENGINEERING COMMENTS ITEM: The Burch Addition, Lot 4, Block A, Final Plat, to allow de~-elb~ an orthodontics clinic on property located at the west side of Denton Tap Road, approximately 535 feet south of Bethel School Road, at the request of Dowdey, Anderson and Associates. DRC DATE: April 27, 1995 and May 4, 1995 CONTACT: Ken Griffin, P.E., Assistant City Manager/City Engineer 004-3679) COMMENT STATUS: :,,zr.~ ~ · D~,~ ~a.~,,z ~ Dy ~' FINAL Site Plan & Landscape Plan Comments: 1. On the landscape plans, the sewer easement on the north side of the lot should be correctly shown as 20 feet. 2. Show on-site utility locations. 3. Show easement for fire hydrant. 4. On site plan, show 15' utility easement (comment made in the 5/4/95 landscape plan review letter). Developer Information Comment: It appears as though the location of the irrigation system and the landscaping is going to be in conflict with the sanitary sewer to be constructed late this year. There needs to be some discussion between the applicant and the City as to the possibility of delaying the installation of the irrigation and landscaping until such time as the sewer line has been installed without delaying the approval of a CO, if in fact the facility is constructed prior to the installation of the sanitary sewer line. / Development Review Committee Planning and Zoning Commission Councilmembers of the City of Coppell 225 Parkway Blvd. Coppell, Tx 75019 Frank J. Stich III, DDS, MSD Orthodontics · TMJ · Dentofacial Orthopedics 9 995 To all those concerned: It is with great pleasure that I embark on this building undertaking for which I have submitted my final plat. I have truly enjoyed the opportunity to contribute to the business community here in Coppell and I plan to remain here in the city for many years to come. The image of commitment, the presentation of excellence, and the distinction of differentiation are the goals that I have sought in the land purchased and the design of the facility that I propose. I envision a facility of uniqueness and comfort that contributes to the experience received by my patients and the image of Coppell as a first class community. I chose the lot concerned due to the native trees existing, the opportunity for a creek view, the buffer on the north and south sides provided by the creek and the trees, and the location on a primary thoroughfare. In the attempt to preserve the natural elements afforded by the native trees and landscape, I have hired a consulting arborist, Harold Spiegel (991-8448), to assist with the planning, construction and post construction phases of my project. The Engineering Department of the City of Coppell has been especially helpful and accomodating with the relocation of the sanitary sewer line which you see on the plat. While choosing the design of my building, I wanted a style that would diffentiate this professional building from the other service and retail facilities proposed for the Burch Addition. I also desired a comfortable, home feel for the patients and their families, as well as an architectural style that blends with the native landscape and the Southwest. With these thoughts in mind I chose a Texas Hill Country Architectural Style characterized by the quarried natural sandstone, a low pitch metal roof, long overhangs and an abudance of windows. This same stone will be carried through the monument sign, the retaining walls and the landscaping. I hope I have been able to reveal to you the vision of excellence I have for this facility, and the contribution that I know it will make for the image of Coppell. I look forward to your comments, suggestions, and our future meetings. IfI can answer any questions for you personally, please do not hesitate to call. Respectfully Submitted, \ .:i iiii.' Frank J. Stich III, DDS ~v~rn[3c. rs AmericaFi Associatico of Orthodontists 580 S. Denton Tap Rd. Suite 220 Coppell, Texas 75019 - _ A (214) 462-7892 ~ 13. pUBLIC HEARING: Consideration and approval of The Fairways at Riverchase, Replat of I~ 30-55~ BIQ~k "A", to change the location of the ]00-year ~E~A~ Floodplain on Lots 30 through 55, Block "A" located along the north side of Kingsmill Court and Berkshire Lane. Gary Sieb, Director of Planning and Community Services, made a presentation to the Council. Mayor Morton opened the Public Hearing and asked for those persons wishing to speak against this proposal. There were none. He then asked for those persons wishing to speak in favor of this proposal. Again, there were none. Mayor Pro Tem Robertson moved to close the public hearing the approve The Fairways at Riverchase, Replat of Lots 30-58, Block 'A', to change the location of the 100-year FEMA Floodplain on Lots 30 through 58, Block "A' located along the north side of Kingsmill Court an Berkshire Lane. Councilmember Tunnell seconded the motion; the motion carried 7-0 with Mayor Pro Tem Robertson and Councilmembers Alexander, Sturges, Watson, Tunnell, Mayo, and Sheehan voting in favor of the motion. 14. Consideration and approval of The Burch Addition, Lot 4, Block "A", Final Plat, to allow development of an orthodontics clinic on property located at the west side of Denton Tap Road, approximately 535 feet south of Bethel School Road. Gary Sieb, Director of Planning and Community Services, made a presentation to the Council. Michael Cart made a presentation to the Council concerning bike trails. Mayor Pro Tern Robertson moved to approve The Butch Addition, Lot 4, Block "A", Final Plat, to allow development of an orthodontics clinic on property located at the west side of Denton Tap Road, approximately 535 feet south of Bethel School Road with the hike and bike trail to be relocated to the front of the property with the following conditions: 1) provision of an easement for overhead electric utilities, as described previously, and subject to City Council approval of a variance of the requirements of Appendix C Section of the Subdivision Ordinance; and 2) revision of the site plan and landscape plan to show sewer easement on the north side of the lot as a 20'-wide easement, on-site utility locations, fire hydrant easement and 15'-wide utility easement as recommended by the Engineering Department. Councilmember Mayo seconded the motion; the motion carried 7-0 with Mayor Pro Tem Robertson and Councilmembers Alexander, Sturges, Watson, Tunnell, Mayo, and Sheehan voting in favor of the motion. 15. Discussion and consideration of Mayoral appointments to City Council standing committees and liaison responsibilities. Mayor Pro Tem Robertson moved to approve the Mayoral appointments to City Council standing committees and liaison responsibilities. Councilmember Watson seconded the motion; the motion carded 7-0 with Mayor Pro Tern Robertson and Councilmembers Alexander, Sturges, CM061395 Page 6 of 8