Christ Sav/FP-CS 890420CLIFTON E. OWENS AND ASSOCIATES
Business and Residential Design Services
April 20, 1989
City of Coppell
255 Parkway Blvd.
Coppell, Texas 75019
Attention: Mrs. Taryon Bowman
Planning and Zoning Coordinator
Re: Christ Our Savior Lutheran Church
Dear Mrs. Bowman,
Christ Our Savior Lutheran Church is planning to begin
construction shortly on the new School and Church facility on
the five acre site just south of the existing building at
Sandy Lake and Heartz.
The original plan in the three phase project, was to build a
12,500 square foot facility to start, then add the additional
school and sanctuary space in two other phases.
We have met with some budget restraints and must pursue some
options to reduce the initial cost of the project.
The Church has asked my company to review the initial plans
and evaluate where we might find these savings.
They have requested to reduce the size of the phase one
building to approximately 10,000 square feet.
We would like to review the plans with your office in an
effort to determine some options we might consider.
The primary problem is the first phase of the project is so
small that the site improvements required escalate the cost
of the project significantly.
We would like if the city would consider phasing some of
these with the next two phases.
3150 Premier Drive
Suite 121 * Irving, Texas 75063
(214) 550-0066
-page two-
Christ Our Savior Lutheran Church
April 20, 1989
Any assistance you can offer would be much appreciated since
the urgency of this expansion is more pressing than ever.
Thank you for your consideration in this matter.
I will be contacting you in order to arrange a meeting to
discuss this in more depth.
Cl~/ftol
Cliftol
Owens
E. Owens and Associates