Loading...
Christ Sav/FP-CS 880517HENNESSEY ENGINEERING, INC. 1409 THIRD STREET · CARROLLTON, TEXAS 75006 · (214) 245-9478 May 17, 1988 Mrs. Taryon Bowman Planning & Zoning Coordinator City of Coppell Planning Dept. Coppell, Texas Re: Christ Our Savior Lutheran Church - Job 8594 Dear Taryon: The following is a list of estimated construction costs for the above referenced subdivision: 1 Fire Hydrant & Water Service 6" Sanitary Sewer W/Bore 2 - 21" Storm Sewers & Curb Inlets Total Very truly yours, Pete Hennessey, P.E. President PH/j t D92': 1 $ 2,500.00 2,500.00 20,000.00 $25,000.00 STRUCTURAL CIVIL PLANNING . SURVEYING