Loading...
Apostles/FP-DR 961031 (6) !i~, 06'f 3 I I996 "i~ELECTRIC !~ i ,~. CITY OF COPPELL DEVELOPMENT REVIEW COMMITTEE October 31, 1996 SUBJECT: CHURCH OF THE APOSTLES FINAL PLAT IS NOT ACCEPTABLE. EASEMENTS WILL BE REQUIRED FOR THE PROPOSED ELECTRIC FACILITIES. A PLAT WITH EASEMENT REQUIREMENTS WILL BE PROVIDED TO THE DEVELOPER. LOAD INFORMATION (SIZE OF A/C, HEAT LOAD) WILL BE REQUIRED FROM THE DEVELOPER BEFORE EASEMENTS CAN BE DETERMINED. PLEASE CALL ME AT 972-888-1307 IF YOU HAVE ANY QUESTIONS. TIM BRANCHEAU