Loading...
Connell/Skaggs/FP-CS 870107 POWELL&POWELL Engineers and Consultants ~V. J. Powell P.E. -- 1925-1967 January 7, 1987 W. Llewellyn Powell P.E. Richard L. Powell P.E. J. Michael Millican P.E. RE: P&P NO. 3354-85-10-6 Michael D. McK(~nzie Connell Skaggs Addition Ms. Shohre Daneshmand City of Coppell 255 Parkway Blvd. Coppell, TX. Dear Ms. Daneshmand: As you are aware, Connell Development Co. is in the process of developing a 14 acre tract of land located at the northwest corner of Sandy Lake Road and Denton Tap Road in Coppell, Texas (Connell Skaggs Addition). A Preliminary Plat and a Site Plan for this tract have been approved by both the City Planning and Zoning Commission and the City Council. In addition to these approvals, Connell has entered into an agreement with the City regarding the construction of drainage improvements along the west line of the site coincident with the development of Lot 3 as shown on the Preliminary Plat. This agreement allows Connell to obtain building permits for and to develop Lots 1, 2 and 4 without the requirement of the construction of drainage improvements along the west line of the site. However, the issuance of a building permit on Lot 3 will require the construction of these drainage improvements. At this time, Connell Development Co. wishes to proceed with the development of Lots 1, 2, and 4 of this site. In addition, Connell proposes to construct certain improvements on Lot 3 prior to the construction of the drainage improvements or any structures located on Lot 3. These improvements are sketched on the enclosed print (Preliminary Site Plan, P&P Drawing No. S-1311.2, dated October, 1985), and include the following items: A. The construction of a 8-inch water main loop connecting to an existing 8-inch main in Sandy Lake Road at the southwest corner of the site as shown on the approved Preliminary Site Plan. B. The construction of a 8-inch sanitary sewer main connecting to an existing manhole at the southwest corner of the site as shown on the approved Preliminary Site Plan. C. The construction of approximately 60,000 square feet of concrete pavement and a driveway to Sandy Lake Road at the front of the site. D. The construction of approximately 30,000 square feet of concrete pavement at the rear of the site. E. The construction of a temporary asphalt driveway from the parking at the front of the site to the truck loading area at the rear of Lot 1. 3354a/1230 3988 North Central Expressway, Suite 1130 / Dallas, Texas 75204 / (214) 5224660 Ms. Shohre Daneshmand January 5, 1987 Page 2 Please review the proposed improvements and offer any comments you may have as soon as possible. Very sincerely, POWELL & POWELL ../--/J. Michael Millican / J M 51:ck enclosure cc: Mr. Kevin White - Connell Development Company Mr. Bill Stapp - Connell Development Company Mr. Joe Patti - Good, Haas & Fulton 3354a/1230