Loading...
Connell/Skaggs/FP-CS 870615 Coppell, Texas 75019 The City With A Beautiful Future 214 - 462 - 0022 June 15, 1987 Mr. Jim Koch Powell and Powell Engineers 3988 N. Central Expressway Suite #1130 Dallas, Texas 75204 RE: Connell/Skaggs, Lot 4, Final Plat Dear Mr. Koch: Listed below, please find the fees for the above referenced project, which were calculated by Mr. Gabe Favre of Ginn, Inc., and were made available to me on June 8, 1987: FEES DUE TOTAL FEES 6-18-87 S.U.P. * 615.00 - Zoning - - Preliminary Plat * 104.00 - Final Plat * 125.88 - Water Availability 808.00 404.00 Sewer Availability - - Water Tap Fees (Assume 2) 100.00 100.00 Sewer Connection (Assume 2) 100.00 100.00 Construction Permit Fees: 1) initial deposit 847.00 847.00 2) 1.5% construction estimate to be determined - 3) actual cost to be determined - Water Load Test to be determined - Street Lights (estimate 3) @ 261.00 783.00 - Street Signs to be determined - Street Assessment: ($100 estimated/Front Foot) 16,723.00 - Utility Inspection Fee 150.00 - $1,451.00 * These fees have been paid The amount of $1,451.00 is due before June 18, 1987 at 2:00 p.m., prior to Final Plat approval by the City Council on June 23, 1987. Please call me at 462-0022, extension 249; or Gabe Favre at 248-4900 if you have any questions. Sincerely, Shohre Daneshmand Civil Engineer SD/lsg cc: Frank Trando, Director of Finance Gabe Favre, Ginn, Inc. Taryon Bowman, P & Z Coordinator Steve Goram, Director of Public Works CONNELL/FEES PZAGN