Connell/Skaggs/FP-CS 870615 Coppell, Texas 75019
The City With A Beautiful Future 214 - 462 - 0022
June 15, 1987
Mr. Jim Koch
Powell and Powell Engineers
3988 N. Central Expressway
Suite #1130
Dallas, Texas 75204
RE: Connell/Skaggs, Lot 4, Final Plat
Dear Mr. Koch:
Listed below, please find the fees for the above referenced project,
which were calculated by Mr. Gabe Favre of Ginn, Inc., and were made
available to me on June 8, 1987:
FEES DUE
TOTAL FEES 6-18-87
S.U.P. * 615.00 -
Zoning - -
Preliminary Plat * 104.00 -
Final Plat * 125.88 -
Water Availability 808.00 404.00
Sewer Availability - -
Water Tap Fees (Assume 2) 100.00 100.00
Sewer Connection (Assume 2) 100.00 100.00
Construction Permit Fees:
1) initial deposit 847.00 847.00
2) 1.5% construction estimate to be determined -
3) actual cost to be determined -
Water Load Test to be determined -
Street Lights (estimate 3) @ 261.00 783.00 -
Street Signs to be determined -
Street Assessment:
($100 estimated/Front Foot) 16,723.00 -
Utility Inspection Fee 150.00 -
$1,451.00
* These fees have been paid
The amount of $1,451.00 is due before June 18, 1987 at 2:00 p.m., prior
to Final Plat approval by the City Council on June 23, 1987.
Please call me at 462-0022, extension 249; or Gabe Favre at 248-4900 if
you have any questions.
Sincerely,
Shohre Daneshmand
Civil Engineer
SD/lsg
cc: Frank Trando, Director of Finance
Gabe Favre, Ginn, Inc.
Taryon Bowman, P & Z Coordinator
Steve Goram, Director of Public Works
CONNELL/FEES
PZAGN