Loading...
Austin Place/FP-CS 960110Coppell, Texas 75019 Mr. Randy Lockhart Standard Pacific of Texas 5525 MaeArthur Boulevard,//580 Irving, TX 75038 P.O. Box 478 Coppell, Texas 75019 214-462-0022 January 10, 1996 RE: Austin Place. Final Plat Dear Randy: This letter is to inform you that your request for approval of Austin Place, Final Plat, 'to allow the development of a residential subdivision, located on the east side of Moore Road, approximately 250 feet north of Sandy Lake Road, was approved by the Coppell City Council on Tuesday, January 9, 1996. The following conditions apply: (1) The landscape plan shall be sealed by a licensed landscape architect or a bonafide nurseryman and the irrigation plans shall be sealed by a licensed landscape irrigator. (2) Park fees be paid. (3) Moore Road should be built with this development. (4) The drainage issue needs to be addressed and resolved prior to final approval of this plat. O) The 20' drainage easement provided between lots 5 and 6 of Block C should also be labeled as an utility easement. (See Engineering Comments) (6) Provide an off-site storm sewer easement at the northeast corner of property. Approval of this Final Plat is valid for six (6) months from the City Council agenda date. If the Final Plat has not been submitted to the Planning Department prior to July 9, 1996, the Plat shall be deemed null and void and resubmittal shall be required. See the attached checklist for the requirements for executing final plats and replats. mmunity Services Lcc: Richard Payne, Carter and Burgess, Inc. Isabelle Moro, P&Z Coordinator Building Inspection DEVELOPMENT I VIEW COMMITTEE ENGINEERING COMMENTS COUNT STATUS: ~~p Plat 1. Moore Road should be built with this development. 2. The drainage issue needs to be addressed and resolved prior to final approval of this plat. 3. The 20' drainage easement provided between lots 5 and 6 of Block C should also be labeled as a utility easement. This is the location the City has identified to install a sewer line to help relieve inadequate sewer lines down stream of this development. This will insure adequate sewer service for this development. 4. Provide an off-site storm sewer easement at the northeast comer of property