Christ Church/PP-AG 900911 4-24-89
/ /
AGEN REQUEST FORM
~ ~"c~u~r"u~ CItY COUNCIL MERGING Septembe~ 11, 1990 I~EM NO.
ITEM CAPTION:
Consider approval of a preliminary plat fro' the Coppell Church of Christ, located approximately
443 feet mca'th of the northwest c~-ner of Sandy Lake Road and Samuel Boulevard, at the request
of Coppen Church of Christ, Joe Fitch, Trustee.
SUBMITTED BY: STAFF~R1~P,. :__ Gar~ L, Sieb, PI ..i.~o Dirge..~
0THERk'~.-:~
EVALUATION OF IT~ DATE:
Date of Pl~--{-oo & Zon{-g Commission: August 16, 1990
Decision of P]~--~-g & Zo-i-g Commission: Approved (7-0)
Please see attached staff report f~ further det~il-~.
BUDGET AMT.: N/A AMT. ESTIMATED: AMT. +/- BUDGET:
COMMENTS: FINANCIAL REVIEW BY:
LEGAL REVIEW BY: . .. REVIEWED BY CM:
AGENDA REQ FORM
0588DS
CITY OF COP~PELL
PLANNING DEPARTMENT
STAFF REPORT
COPPELL CHURCH OF CHRIST - PRELIMINARY PLAT
P & Z HEARING DATE: August 16, 1990
C. C. HEARING DATE: September 11, 1990
LOCATION: Approximately 443 feet north of the northwest corner of
Sandy Lake Road and Samuel Boulevard.
SIZE OF AREA: 1.573 Acres
REQUEST: Approval of a preliminary plat.
APPLICANT: Coppell Church of Christ
Joe Fitch, Trustee
728 S. Coppell Road
Coppell, Texas 75019
(214) 393-2945
TRANSPORTATION:
Access to this church site will be gained by way of Samuel
Boulevard.
SURROUNDING LAND USE & ZONING:
North - Lee Elementary School (C zoning)
East - Georgetown Shopping Center &
St. Ann Catholic Church (C zoning)
South - Residential (PD-SF)
West - Vacant (SF-12)
COMPREHENSIVE PLAN:
ANALYSIS: This 1.573 acre site is properly zoned for the use of a
church, and will not require a Special Use Permit since it
is zoned (C) Commercial. The applicant plans to construct
a 7000 square foot church that includes enough space for
classrooms. Future expansion of the church may occur to
the north or west of this property, as future contracts are
settled with the present property owner.
ITEM ?
Parking spaces as indicated on the site plan, meet and
exceed the minimum parking regulations by an extra four
spaces. Landscaping will be provided in the front yard and
along the west side of the building. The lighted,
identification sign, which is shown on the Site Plan, is
labeled for review purposes only. The final inspection
will occur at the time of Building Inspection review, and
will be subject to conformance of the Sign Ordinance.
ALTERNATIVES: 1) Approve the preliminary plat
2) Deny the preliminary plat
ATTACHMENTS: 1) Site Plan 2) Preliminary Plat
3) Landscape and Irrigation Plan
4) Drainage letter from applicant's Engineer
CCOCSTF
DAN M. DOWDEY & ASSOCIATES
CIVIL ENGINEERS
16250 DALLAS PARKWAY SUITE 100
DALLAS, TEXAS 75248
(214) 931-0694
August 9, 1990
Ms. Shohre Daneshmand, P..E.
City Engineer
City of Coppell
255 Parkway Boulevard
Coppell, Texas 75019
RE: COPPELL CHURCH OF CHRIST
PRELIMINARY PLAT
Dear Shohre:
As a result of the Review Committee Meetings regarding the above
referenced property, I have been authorized to prepare a study
of the drainage situation from the northwest corner of the school
site to the 10 acre commercial tract owned by Univest Development
Company.
In this study, I will determine a solution to the current
drainage problems at said location, as it is impacted by
impending development of the 10 acre tract, of which the church
tract is a part thereof.
The study will be completed prior to submission of final
engineering plans and final plat of the subject property.
The Coppell Independent School District property is an integral
part of the study.
Mr. Mike Allen, Univest Development Company, is in the process
of coordinating the results of the study with the School
District's representatives.
If you have any questions, please do not hesitate to contact
me.
Very truly yours,
William A. Anderson, P. E.
WAA:hc
CC: w~s. Taryon Bowman, Planning & Zoning Coordinator Mr. Ben Delacurz, Public Works Coordinator