Loading...
C Cross 1P/PP-CS 980116COPPELL, TEXAS 75019 P.O. Box 478 Coppell, Texas 75019 972-462-0022 January 16, 1998 Mockingbird Management Co. P.O. Box 193053 Lewisville, TX 75029 RE: CoppeH Crossing, Preliminary_ Plat Dear Sir/Madam: This letter is to inform you that the Coppell Crossing, Preliminary Plat, to allow the development of five commercial lots on a 9.891 acre tract of land located at the northwest corner of MacArthur Boulevard and Beltline Road was recommended for approval by the Coppell Planning and Zoning Commission on Thursday, January 15, 1998, subject to the following conditions: (1) Adjustments being made on the final plat, site plan, or both, regarding the location of property lines within shared driveways. (2) Provision of domestic water service from in front of fire detector check meters and not from firelines. (See Engineering Comments.) (3) Provision of a utility easement a minimum of 10' by 15' for the fire detector check meter vault. (See Engineering Comments.) (4) Showing all sight visibility triangle easements on the plat at all points of driveway ingress and egress. (See Engineering Comments.) For your information, the Site Plan was not recommended for approval. The Commission will consider all Site Plans for this development separately when Final Plats are submitted for consideration. The date scheduled for consideration by the Coppell City Council is Tuesday, February 10, 1998, at 7:30 p.m. A representative for this case must be present at this meeting. Failure to represent this item may result in the denial of this application. City Council has instructed staff to include in its agenda packets only those items which accurately reflect conditions as recommended by the Planning and Zoning Commission. The submittal deadline for revised drawings is 12 noon, Wednesday~ January_ 28, 1998. Therefore, please submit 17 folded copies of the revised drawings, plus three 8 1/2" x 11" paper reductions on or before that date. The drawings which require change in order to comply with Planning and Zoning recommendations are: Preliminary Plat, Concept Plan and the Preliminary Landscape Plan. If you have any questions, please contact me at (972) 304-3675. Sincerely, Pert Virtanen Assistant Director of Planning & Community Services cc: Jim Kurtz, Kurtz-Bedford Associates, Inc. Isabelle Moro, AICP, P&Z Coordinator" Building Inspection ~-.T.~' DEVELOPMENT REVIEW COM~ ENGINEERING COMMENTS ITEM: DRC DATE: December23, 1997 and December 30, 1997 CONTACT: MOr~ Man~ P.E.,,4ssetaat CiO, 1. Domestic water service cannot be taken off of the firelines. They must be taken in front of the fire detector check meters. · 2. A minimum of a 10' by 15' utility easement will need to be provided for the fire detector check meter vault. 3. Show all sight visibility triangle easements on the plat at all ingress and egress driveways.