Loading...
Connell/Skaggs/FP-CS 870518 (2)GINN, INC. CONSULTING ENGINEERS MEMORANDUM TO: Shohre Daneshmand FROM: Gabe Favre DATE: May 18, 1987 SUBJECT: Connell Skaggs - Lots 1, 2, 3, 4 As per your request, we have calculated the fees for the above referenced project based upon the only information we have at the present. Summary of all fees is as follows: Zoning ~.~ O 268.30 Preliminary Plat [~.O0 116.00 Final Plat 578.07-- ~-~.~ Water Availability 8,634.96 -- ~O.O~ Sewer Availability 8,634.96 Water Tap Fees (assume 2) 200.00 Sewer Connection (assume 2) 200.00 Construction Permit Fees 1. initial deposit 962.37 .... ~-~ 2. 1.5% construction estimate 17,260.00.-- 3. actual cost to be determined Water Load Test to be determined Street Lights (estimate 8) 2,088.00 7 Street Signs to be determined Street Assessment 161,700.00 ~ ~,~O'~Q Utility Inspection Fee 300.00 Gabe Favr~ 0305 C9~ ' shohre3 ~' ~ O~ ~ ~.~ 17103 Preston Road * Suite !~ · kC 118 · Dallas. lexas 75248 · Phone 2141248-4900