Loading...
Connell/Skaggs/FP-CS 870518 GINN, INC. CONSULTING ENGINEERS MEMORANDUM TO: Shohre Daneshmand FROM: Gabe Favre DATE: May 18, 1987 SUBJECT: Connell Skaggs - Lots 1, 2, 3, 4 As per your request, we have calculated the fees for the above referenced project based upon the only information we have at the present. Summary of al~ fees is as follows: Zoning 268.30 Preliminary Plat 116.00 Final Plat 578.07 Water Availability 8,634.96 Sewer Availability 8,634.96 Water Tap Fees (assume 2) 200.00 Sewer Connection (assume 2) 200.00 Construction Permit Fees 1. initial deposit 962.37 2. 1.5% construction estimate 17,260.00 3. actual cost to be determined Water Load Test to be determined Street Lights (estimate 8) 2,088.00 Street Signs to be determined Street Assessment 161,700.00 Utility Inspection Fee 300.00 Gabe Favre /jo 0305 shohre3 17103 Preston Road · Suite 1~ * LB 118 · Dallas, lexas 75248 * Phone 214/248-4900