Connell/Skaggs/FP-CS 870518 GINN, INC. CONSULTING ENGINEERS
MEMORANDUM
TO: Shohre Daneshmand
FROM: Gabe Favre
DATE: May 18, 1987
SUBJECT: Connell Skaggs - Lots 1, 2, 3, 4
As per your request, we have calculated the fees for the above
referenced project based upon the only information we have at the
present. Summary of al~ fees is as follows:
Zoning 268.30
Preliminary Plat 116.00
Final Plat 578.07
Water Availability 8,634.96
Sewer Availability 8,634.96
Water Tap Fees (assume 2) 200.00
Sewer Connection (assume 2) 200.00
Construction Permit Fees
1. initial deposit 962.37
2. 1.5% construction estimate 17,260.00
3. actual cost to be determined
Water Load Test to be determined
Street Lights (estimate 8) 2,088.00
Street Signs to be determined
Street Assessment 161,700.00
Utility Inspection Fee 300.00
Gabe Favre
/jo
0305
shohre3
17103 Preston Road · Suite 1~ * LB 118 · Dallas, lexas 75248 * Phone 214/248-4900