Loading...
Connell/Skaggs/FP-CS 870615 The City With A Beautiful Future 2Cl°f-P~l~'2T-e~275019 June 15, 1987 Mr. Jim Koch Powell and Powell Engineers 3988 N. Central Expressway Suite #1130 Dallas, Texas 75204 RE: Connell/Skaggs, Lots 1, 2 and 3, Final Plat Dear Mr. Koch: Listed below, please find the fees for the above referenced project, which were calculated by Mr. Gabe Favre of Ginn, Inc., and were made available to me on June 12, 1987: FEES DUE TOTAL FEES 6-18-87 S.U.P. * 270.00 - Zoning 264.60 264.60 Preliminary Plat * 112.00 - Final Plat * 552.20 - Water Availability 16,950.00 8,475.00 Sewer Availability - - Water Tap Fees (Assume 2) 100.00 100.00 Sewer Connection (Assume 2) 100.00 100.00 Construction Permit Fees: 1) initial deposit 1,198.80 1,198.80 2) 1.5% construction estimate 17,260.00 - 3) actual cost to be determined - Water Load Test to be determined - Street Lights (estimate 7) @ 261.00 1,827.00 - Street Signs to be determined - Street Assessment: 161,700.00 - Utility Inspection Fee 300.00 - $10,138.40 These fees have been paid The amount of $10,138.40 is due before June 18, 1987 at 2:00 p.m., prior to Final Plat approval by the City Council on June 23, 1987. Please call me at 462-0022, extension 249; or Gabe Favre at 248-4900 if you have any questions. Sincerely, Shohre Daneshmand Civil Engineer SD/lsg cc: Frank Trando, Director of Finance Gabe Favre, Ginn, Inc. Taryon Bowman, P & Z Coordinator Steve Goram, Director of Public Works CONNELL/FEES PZAGN