Loading...
Connell/Skaggs/FP-CS 861205 POWELL & POWEL~ ~'~?~:.~ ®~Li b~d.,~LKJ~[}~ 1,',~"~ ~: ,.~,-~,v~, ~.~-~-~Lj 3988 N. Central Expwy. Suite 1130 DALLAS, TEXAS 75204 Dec. 5, 1986 I 3354-85-10-6 (214) 522-4660 Mr. Larry Jackson TO Sallinger, Nichols, Jackson, Kirk & Dillard Connell SkaR~s Addition, Coppell, TX 1800 Lincoln Plaza Dallas, Texas 75201 WE ARE SENDING YOU IZI Attached ~ Under separate cover via Cour~er the following items: ~- Shop drawings [] Prints [] Plans [] Samples [] Specifications [] Copy of letter [] Change order ~ P.~.~r E.~r~m~r~ COPIB OAY~ NO. D[SCRI~ION 1 12--5--86 ---- Construction Cost Estimate for a box culvert aloha the west line of the site from Sandy Lake Road to "Willow Lane" THESE ARE TRANSMIT[ED as checked below: [] For approval [] Approved as submitted [] Resubmit copies for approval [~ For your use [] Approved as noted [] Submit copies for distribution [] As requested [] Returned for corrections [] Return__corrected prints ~ For review and comment ~ As requested by Mr. Kevin Wb. ite- Conne!l Development Co. [] FOR BIDS DUE 19 [] PRINTS RETURNED AFTER LOAN TO US REMARKS Mr. Ed Powell - City of Coppell w/ eric. (by courier) ~It. Kevitt WItlL~ - Cutttt~ll D.v. w/ COPY TO Mr. Bill Stapp- Connell Dev. w/ enc.SIGNED: ............ - ........ ,,..~, ........... , .... ,.~. ~,~,, .o,,,, ~.., o.,/~.~.~ ^. Koch. .~r. P&P W.O. No. 3354-85-10-6 Connell Skaggs Addition December 5, 1986 COST ESTIMATES FOR BOX CUI,VERT CONSTRUCTION FROM SANDY LAKE ROAD TO "WILLOW LANE" Length = 1234' Breakdown by Owner: Connell 566' 46% Boorhem 472' 38% t{inckley 196' 16% 10' x 8' Single Box Culvert Pre-Cast: (at $270/LF) Box Culvert $335,000.00 Upstream Transition 5,000.00 Downstream Transition 5,000.00 $345,000.00 Cost Per Property Owner Based on Frontage of Box Connell .46 (345,000) = $159,000.00 Boorhem .38 (345,000) = $131,000.00 Hinckley .16 (345,000) = $ 55,000.00 3354/WD1001