Loading...
Coppell YMCA/PP-CS 971111 (2)TO: DOWDE--'Y, ANDERSON AND ASSOCIATES, INC. CIVIL ENGINEERS 5225 VILLAGE CREEK DRIVE SUITE 200 PLANO, TEXAS 75093 (972) 931-0694 FAX (972) 931-9538 MEMO Isabelle Moro Planning Coordinator of City of Coppell, Texas DRC Comments 10/30/97 Coppell Family, YMCA Isabelle Moro - Planning Comments 1. We will submit architectural elevators, materials, signs etc. to the architectural review board. 2. Landscape plans will be revised to address staffs concerns. 3. We will provide a 6' high masonry wall along the east property line behind the building and parking area. We are requesting a variance to the wall requirement from the end of the building to the south property line. This area is heavily trees and is proposed to have courts, outdoor pool and a open air chapel. Eliminating the wall will provide access to the YMCA facility and the hike and bike trail from the adjacent Chaucer Estates while screening the building and drives. 4. The irrigation plan will be submitted with the fire landscape plans. 5. Loading, trash facilities and screening will be shown on the preliminary site plan. 6. The location of the TU transformer is shown on the utility plan near the power pole 50' south of the northeast corner of the site. 7. Screening of rooftop mechanical equipment is shown on the elevation of the building. Engineering Comments- Mike Martin, P.E. Assistant City Engineer Site Plan: 1. We have revised to be shared access with the police and fire facility. Preliminary Water, Sanitary Sewer & Drainage Plan: 1. We will extend the 8" water line along Town-Center Boulevard and loop a private 6" line around the building. 2. We are agreeable to the idea of extending the 39" RCP through the City's property, if a reimbursement of the City's portion of the storm sewer can be worked out. Brad Reid - Park Planning: 1. An irrigation plan will be provided with the final landscape plan. 2. The key list on the tree survey has been revised. Greg Jones - Chief Budgeting Official: 1. Additional information has been provided on the preliminary site plan. Travis Crump - Acting Fire Marshall: 1. The fire line has been looped. 2. A fire department connection has been added. 3. An additional fire hydrant has been added on the west side. 4. The building will be protected by a automatic fire sprinkler system. 5. A fire alarm system will be installed. 6. The chapel is an open air Ampha Theater. It is not covered. AICP file/memo. DRC Comments YMCA