Coppell YMCA/FP,SP-DR 980129(5) ! !
~JELECTRIC
JAN q 0 ~ , i
Comments for the City of Coppell
Development Review Committee
~/Final Plat for
Date /--~-~-~
~/ ~/Final Plat is~ acceptable.
Easements will be required for proposed electric facilities. A plat with easement
requirements will be provided to the developer.
Load information (size of structure, AC/Heat Load) will be required from the
developer before easements can be determined.
~Other comments .'~
Please call me at 972/888-1307 if you have any questions.
Tim Brancheau
14400 Josey Lane Farmers Branch, Texas 75234