Loading...
C Cross L4/FP-DR000330 N~AR 2000 DE VEL OPMENT RE VIE W C020101511 ENGINEERING COMMEJ' ,ri ',5' ITEM: Coppell Crossing. £ot 4. Block 1. Final Plat and Site Plan. to allow the development of 8,498 square foot retail building on approximately 1.5 acres of property located at the northwest corner of S. MacArthur Boulevard and the D.A.R.T. right-of-way, at the request of David Cannon & Associates. DRC DATE: March 30, 2000 and April 6, 2000 CONTACT: Mike Martin, P.E., Assistant City Engineer (972-304-3679) REVISED AFTER P&Z 1. Provide preliminary utility plan so staff can determine if easements are needed.