Loading...
Cpl HS 1P/PP-CS 870130GINN, INC. CONSULTING ENGINEERS TO: FROM: DATE: SUBJECT: City of Coppell Attn: Shohre Daneshmand, Civil Engineer Attn: Taryon Bowman, Senior Planning Technician Ginn, Inc. January 30, 1987 Coppell High School Preliminary Plat and Plans In the short time frame available to us, we made a cursory review of the above referenced subject for general conformance to the City of Coppell Subdivision Ordinance, Zoning Ordinance, and applicable standards. The following sets forth our comments. At the meeting held on January 26, 1987, regarding the above, and previous comments by DRC, many questions were answered. The following comments were our initial thoughts at the time of review. They may or may not be applicable at this point in time. A traffic study should be made with Engineer's recommendations for flow on site, ingress, and egress points. Provide signature blocks on plat for P&Z and Council to sign. 3. Have Engineer's seal on plans. 0 Indicate screening walls as required by ordinance. We understand a variance has been submitted for this item. Proposed open drainage channel should be changed to an enclosed system. Do not allow traffic onto Oak Trail and Shadydale Lane by way of Willow Lane. Provide additional information regarding proposed align- ment of Parkway Boulevard and street extension from school site to Parkway Boulevard; taking into considera- tion right-of-way requirements, design speed, curve alignment, distance from bridge, and possible signalization. Provide an up-to-date accurate topographical map. These contours appear to be taken from 1" = 200' scale aerial photography and may be adequate for planning purposes only, not final grading plan. 9. On location map show all existing adjoining streets. 17103 Preston Road · Suite 100 · LB 118 · Dallas, Texas 75248 · Phone 214/2484900 10. Provide documentation of outfall drainage easements being secured. We would like to have the opportunity to review the plans again prior to being approved for final platting. Gabe Favre /ss