Loading...
Cpl HS 1P/PP-CS 870122 (2)UNIVEST DEVELOPMENT COMPANY January 22, 1987 City of Coppell 255 Parkway Boulevard Coppell, Texas 75019 Re: New Coppell High School Gentlemen: The Parks of Coppell Joint Venture II ("PCJV") intends to reasonably cooperate with the Coppell Independent School District ("CISD") in ex- pediting the initiation and completion of the construction of the new high school for its opening in September, 1988. We realize that time is of the essence in being able to meet the scheduled opening date. Therefore, we are writing this letter to express our support of the CISD preliminary plat which is on your agenda for January 27, 1987. Please be assured that PCJVand CISDhave reached the following agreements in concept: ® PCJV will provide off-site drainage easements required to outfall the required drainage structures to be in- stalled to serve the school site. Among these struc- tures is the box culvert along the east line of the school site which will be terminated at the school's north line and then outfalled into an earthen ditch across the undeveloped PCJVproperty. PCJVwill also provide as additional easement which will begin in the middle portion of the north line of the school tract and extend northward across our property in an enclosed pipe system to Cottonwood Creek. The alignment and width requirements of the two easements will be estab- lished during final design. e PCOV will provide sanitary sewer easements as required in the development of sewer service for the school tract. This is anticipated to include one short ease- ment frc~ the east line of the school tract extending to the existing sewer easement on PCOV property where an 8" sewer presently drains to the north. An addi- tional sewer easement may be provided by PCJV (in the open ditch outfall area for the above mentioned box cul- vert) should final design indicate that part of the existing 8" sewer needs to be rerouted by CISD in order to avoid being exposed by the channel excavation. 12770 COlT RD. ' SUITE 1215. DALLAS, TEXAS 75251 ' 214/233-5771 City of Coppell January 22, 1987 Page Two PCJV will provide up to a 60-street right-of-way for a proposed collector street and associated public utili- ties extending fr~m the school tract's east line to in- tersect with proposed Parkway Boulevard. We will also provide up to an 85' right-of-way for the extension of Parkway Boulevard and associated public utilities fr~m the interesction of Parkway Boulevard and the proposed collector intersection to Denton Tap Road. Aligr~ent will conform approximately to that depicted on the school district's Preliminary Plat currently being con- sidered by the City. Final alignment and design shall be approved by PCJV in writing. The agreements in concept above described are expressly conditioned upon the acceptance and approval by the CISD Board of Directors of a joint development con- tract, reflecting the terms and conditions of PC~V's letter to CISD of January 6, 1987, as modified. PCJV and CISD shall attempt to complete said contract prior to approval of the final plat for the high school site. The above information is being conveyed to the City of Coppell by PCJV to assure the City that the items listed above should not be hindrances in developing the project to the requirements established by the City. Yours very truly, PARKS OF COPPELL ~DINT VENTURE ~icl'~ol R. ~llen MRA/sjp