Loading...
Cpl HS 1P/FP-CS 890503817 336-5773 May 3, 1989 r. Russe~ . yle, City Eng~heer City of 2~Coppell 255 P~kway Blvd. C~i, Texas 75019' Re: New CoppellHil Plat Approval h School Dear Mr. Doyle: As requested by the City through the surveyor, Ayers & Associates, we are submitting this letter to list those public utility items which have been revised from the original plat and plan approval to this date. To the best of our knowledge, the following items have been revised: Add approximately 1000 LF 6" fire line to extend fire protection to the west side of the stadium. Adjust alignment of 60" storm drain north of the north property line to avoid existing sanitary sewer manhole present in the creek. The easement for-the facility was revised accordingly. Be Lower 10' x 8' box culvert from Sra. 7+70 to Sra. 15+20 to accommodate developer to the east. e Delete box culvert headwall at the southeast corner of the site and construct rock rip-rap transition in lieu of headwall for ease of future southerly extension of the box culvert. Item No. 1 was reviewed and approved by the City p~ior to construction. Item Nos. 2 thru 4 were reviewed and approved by the City and coordinated in the field with Steve Morton, Chief Development Inspector. To the best of our knowledge, the above represents the revisions to the plans made during construction and which were approved by City staff prior to construction of said revisions. If you have .any questions, please feel free to call. Sincerely, TEAGUE NALL AND PERKINS, INC. John H. Nail, Jr., P.E. JHN/kfs cc: Gary Keep, SHWC, Inc. 915 Florence Street Fort Worth, Texas 76102