Callejo letter re road alignmntApril 15, 1991
Mr. Gary Sieb
Director of Plan:-,ing a~ld Con~nunit~ Services
CITY OF COPPELL
P.O. Box 478
Coppel 1, Texas 75019
3-3 o
Dear Mr. Sieb:
T recently met with Mr. Greg Carter, a repres~nta5ive o~
E-Systems, Inc. Pool Trust (Pool Trust), the owners of
approximately 56 acres immediately adjacent to the north
of my property, we discussed the alignment of Parkway
Boulevard from its current intersection with Coppell Road
to its future intersection with State Highway 121 (SM
12!). Mr. Carter stated that the Pool Trust is interested
in identifying and geometrically fixing the location of
this future intersection so that tile cit~e~ of Coppel],
(;rapevine and the State Highway can make plans
accordingly. It is also good for us, as property owners,
to know where the SH i21 intersections will be for our
future planniz~g.
I have attached a blueline c :~in9 prepared by Graham
Associates (Graham) dated Ma~ !99]~ (File 97161003--3)
which shows Parkway Boulevard ~end]ng from its current
location at Coppell Road to a;~ intersection with SH 121
where the State Highway Depastment is in the process of
>:]}]ciing a high, way median cut and crossover'. This would
~ tc ?e the most logical place for the intersection,
is agreement with its location as geometrically
. ~ the attached Graham blueline.
I am ~ ...... ~'~ agreement with a connection between Corporate
Park Boulevard and Parkway Boulevard. Since i have not
yet platted my property, ! will work out this location
with the Pool Trust at a later date. As far as the
alignment of Parkway Boulevard through my property, I am
generally in agreement with that shown on the attached
blueiine~ however, I would like to reserve a final
decision on the ~:~metrics of the ~'oadway alignment
through ~ pro~: ...~ un~il such ~ime as the property is
planned for de¥{~]~..~zent or the city desires for the road
to be bui]~
any que.'~.e~n~, please feel free to call.
Sincerely,
William F. CalleDo
enclosure