Cpl HS 1P/FP-CS 870916The City With A Beautiful Future
September 16, 1987
P.O. Box 478
Coppell, Texas 75019
214-462-0022
Mr. Tom Rutledge
Teague Nall and Perkins
915 Florence Street
Ft. Worth, Texas 76102
RE: Approval of Coppell High School
Dear Tom:
Please be advised that your final plat application for Coppell High
School was approved by the Coppell City Council on September 8, 1987.
The stipulations for approval are as follows:
That the building height be granted a variance to allow for a
proposed height of the structure to fifty-two feet (52').
That the variance on the lighting be approved with the use of a
blinder to cut the sideways spillage of the light onto adjacent
property owners.
e
That the variance from the required two thousand (2,000) parking
spaces be decreased to one thousand two-hundred fifty (1,250).
®
That five inches (5") of concrete on a prepared subgrade be allowed
for the entire parking area with no gravel parking areas.
That as many trees as possible will be left on the west with a six'
foot (6') chain length fence being constructed on the outside of
the Crees along the west property line. Dr. Melvin Gross, who was
in the audience the night the preliminary plat was approved by
Council, stated that he would be willing to donate any property to
the school that would be required co put this fence on the outside
area of the trees and this fence would also be constructed along
the southern property line up to Oak Trail. The gate to this
property would be for emergency use only. The gate to this
property on the south side of the property would be considered to
be for emergency traffic only and extra emphasis on shrubbery would
be followed along the south property line from the chain length
fence east to the school's eastern most property line.
That the fees be waived as requested and the City Manager enter
into negotiations with the Coppell I.S.D. for some "in-kind"
training of City employees.
If you have any questions regarding this matter, please feel free to
contact me at (214) 462-0022.
Sincerely,
Taryon Paster Bowman
P & Z Coordinator
TB/lsg
cc: Dale Jackson, Building Official
Steve Morton, Chief of Land Development
RUTLEDGE/HI.SCHL
PZAGN2