Cpl HS 1P/FP-CS 870427COPPFI I HIGH 50-IOOL
ESTIMATED CONSTRUCTION COST
APRIL 27, i~1~87
Water Distribution System ....................... $ 75,000.00
Waste Water System ............................ $ 33,000.00
Storm Sewer System:
A. Public .............. $490,500.00
B. Private .............. 222~800.00
...................... $713,300.00
(est. cost)
(est. cost)
(actual cost)
COPPELL HIGH SCHOOL
ESTIMATED CONSTRUCTION COST
APRIL 27, 1987
Water Distribution System ............ $ 75,000.00 (est. cost)
2. Waste Water System ............... $ 33,000.00 (est. cost)
e
Storm Sewer System:
A. Public .... $490,500.00
B. Private . . 222,800.00
$713,300.00 (actual cost)