Loading...
Cpl HS 1P/FP-CS 870427COPPFI I HIGH 50-IOOL ESTIMATED CONSTRUCTION COST APRIL 27, i~1~87 Water Distribution System ....................... $ 75,000.00 Waste Water System ............................ $ 33,000.00 Storm Sewer System: A. Public .............. $490,500.00 B. Private .............. 222~800.00 ...................... $713,300.00 (est. cost) (est. cost) (actual cost) COPPELL HIGH SCHOOL ESTIMATED CONSTRUCTION COST APRIL 27, 1987 Water Distribution System ............ $ 75,000.00 (est. cost) 2. Waste Water System ............... $ 33,000.00 (est. cost) e Storm Sewer System: A. Public .... $490,500.00 B. Private . . 222,800.00 $713,300.00 (actual cost)