PD115-CS 910213COPPEL~ PUBLIC WORKS
MEMORANDUM
DATE
February 13, 1991
FROM:
Taryon Bowman, Planning and Zoning Coordinator
Shohre Daneshmand, Acting City Engineer~~
Site Plan/Wynn Page/PD-115
We have reviewed the above referenced Zoning Case and provide the
following comments:
Alleys are required, as per the subdivision ordinance.
Staff strongly recommends installation of alleys, since
they improve overall lots' surface drainage, and
therefore, they minimize any potential shallow flooding
and/or drainage problems. Alleys also facilitate off-
site parking, and provide better access for utility
maintenance.
Minor roadway spacing, connecting to major arterial, as
per the thoroughfare plan, is to be at least 660 feet.
Staff generally recommends that roadway curb cuts along
Denton Tap Road be kept to an absolute minimum.
As per conversation with Mr. Lynn Meyer of Unzicker,
Schnurbusch Associates, Inc., the site plan will be
revised to show only one roadway access off of Denton Tap
Road, and the second access from north or south side of
this subdivision. Staff will review such revised plan
when submitted.
Ail engineering related issues, such as proper drainage
design, etc., will be reviewed by Staff at the time of
preliminary and final platting, for general conformance
to Coppell's standards and provisions.
Public Works Staff has no objection to this plan, as long
as referenced comments are addressed.
MSD/bd
xc: Steve Goram, Director of Pubic Works
Ben dela Cruz, Engineering Technician
Public Works DRC Members
Mr. Lynn Meyer, Unzicker, Schnurbusch Associates, Inc.
SITE.MSD