Cpl Pro Plaza/FP-DR 951130 (4) ~ELECTRIC "-
comments for the City of Coppell
Development Review Committee
Prcliminary/Final Plat for C 0~ ~~_ .~,~ C~fr ~ 5,~3' ~
Date I~ -~ ~ ,~
~Prolimina~y/Final Plat is not acceptable.
-JEasements will be required for proposed electric facilities.
A plat with easement requirements will be provided to the
developer.
~//Load information (size of structure, A/C / Heat Load) will
be required from the developer before easements can be
determined.
Other comments
Please call me at 214-888-1307 if you have any questions.
Tim Brancheau
14400 Jose}' Lane Farmers Branch. Texas 75234