Loading...
Cpl Pro Plaza/PP-DR 950928 (2) DEVELOPMENT REVIEW COMMI ENGINEERING COMMENTS development of mo one-~ de~ of~e bu~gs, ~c~ed on ~e e~ ~e of ~n T~ ~, ~pm~e~ 2~ feet so~h of B~~ ~ve, ~ the ~e~ of ~wd~, ~e~on · ~soc~es. Inc. DRC DATE" September 28, 1995 and October 5, 1995 CONTACT: Ken Griffm, P.E., Assistant City Manager/City Engineer (304-3679) COMMENT STATUS: ./'PRELIMINARY Preliminary Plat Comments: 1. An easement should be provided for the meter and double check valve. 2. The screening/landscaping easement should be provided along the east side of the site. 3. There needs to be discussion about the proposed dedication of the area across the Lone Star Gas right-of:way to the City of Coppell. It is my opinion that this should be a private access easement maintained by the Coppell Profession Plaza Addition. 4. Necessary Roadway Impact Fees will be required. 5. A landscaping easement from Lone Star Gas Company right-of-way will be required. Site Plan Comments: 6. The brick pavers should be installed per City of Coppell standards. 7. By providing a 6 fbot sidewalk and utility easement within the 15 foot setback for the parking, I have a question of whether or not adequate landscaping to meet the ordinance requirements is being provided. This should be verified through Gary Sieb. 8. It appears as though the location of the proposed screening wall on the east side of this site leaves a small grass strip between the wall and the east property line. Who is maintaining this strip.'? You may want to consider the relocation of the wall or concreting over the grass strip. 9. The access easements deadend on the north side into the existing CISD property, prior to accessing that property there needs to be verification that there are access easements to tie in to.