Creekview P2/SPRv-AG 990713CITY COUNCIL MEETING: July 13, 1999 ITEM # __] 5
ITEM CAPTION:
Consideration of the Creek View, Phase II, Lot 1, Block B, Site Plan, to allow the construction of 7,946
square foot office building on 1.147 acres of property located at the southeast corner of Denton Tap Road
and Bethel Road.
SUBMITTED BY: Gary L. Sieb
STAFFT~~NT~..irector of Planning and Community Services
APPROK O
BY
CITY COUNCIL
DATE
Date of P&Z Meeting: June 17, 1999
Decision of P&Z Commission: Approved (5-0) with Commissioners Nesbit, Kittrell, Lowry, Halsey and
Stewart voting in favor. None opposed. Commissioners McCaffrey and McGahey were absent.
Approval recommended subject to the following conditions:
1) Granting of the landscape and screening variances by the Board of Adjustment.
2) c.,u...;.. -.......,,;,~...,~-- ..,-- c... o..c~ .....; ...... ,a ........ , (CONDITION MET, HOWEVER
PLEASE SEE ATTACHED COMMENTS FROM LEISURE SERVICES DEPARTMENT.)
4)
Modify the landscape plan to incorporate the following changes:
mb'-Madons. (CO~ON ~
(CONDITION ME~
~, .... ,~ ~c .u~ a~ ......... (CONDITION ~T)
(CONDITION P~T~LY MET)
(CONDITION MET)
7;enR~a RI~eluTes tI~Fo Sn~. ev~ised :/99
FIN. REVIEW:4
CITY MANAGER REVIEW: ~.~
Document Name: ~CREEKVsp
15.
Consider approval of the Creek View, Phase II, Lot 1, Block B,
Site Plan, to nllow the construction of 7,946 square foot office
building on 1.147 acres of property located at the southeast
corner of Denton Tap Road and Bethel Road.
Gary Sieb, Director of Planning and Community Services, made a presentation
to the Council. Mayor Pro Tern Tunnell had questions concerning the notes on
the Landscape Plan and the Site Plan not matching and asked about the roof
material and the money collected for the tree mitigation. Mr. Sieb stated all the
notes must match and that the brick would be burgundy sand and the roof
would be an asphalt heritage brown/beige. Jay Turner, 747 Blue Jay,
Applicant, addressed the questions regarding the roof materials.
Mayor Pro Tem Tunnell moved to approve the Creek View, Phase II, Lot 1,
Block B, Site Plan, to allow the construction of 7,946 square foot office building
on 1.147 acres of property located at the southeast comer of Denton Tap Road
and Bethel Road, subject to the following conditions: 1) granting of the
landscape and screening variances by the Board of Adjustment; 2) payment of
the $15,900 tree mitigation fee, payable to the Coppell Reforestation and
Natural Areas Fund, as volunteered; 3) modify the landscape plan to
incorporate the following changes: (a) identify the location of the Antique Rose
planting; (b) identify the location of the Foster's Holly planting; and (c) identify
the plant material and quantities of same; and 4) the notes on the face of the
Landscape Plan, Site Plan and other exhibits must match. Councilmember
Wheeler seconded the motion; the motion carried 5-0 with Mayor Pro Tem
Tunnell and Councilmembers Peters, Keenan, Wheeler and York voting in favor
of the motion.
16.
Consideration of the Park 'N Fly Addition~ Site Plan
Amendment, to allow the construction of carport structures
and providing limited access to the same along the eastern,
northeastern, and southeastern portions of said site located at
800 Royal Lane.
Mayor Sheehan advised this item had been pulled and postponed at the
Applicant's request.
At this time further discussion was had regarding Consent Agenda Item 8H.
Please see item 8H for minutes.
CM071399
Page 10 of 12
ITEM CAPTION:
AGENDA REQUEST FORM
ITEM
Consideration of the Creek View, Phase II, Lot 1, Block B, Site Plan, to allow the construction of 7,946
square foot office building on 1.147 acres of property located at the southeast corner of Denton Tap Road
and Bethel Road.
SUBMITTED BY: Gary L. Sieb
STAFFT~~NT~..irector of Planning and Community Services
Date of P&Z Meeting: June 17, 1999
Decision of P&Z Commission: Approved (5-0) with Commissioners Nesbit, Kittrell, Lowry, Halsey and
Stewart voting in favor. None opposed. Commissioners McCaffrey and McGahey were absent.
Approval recommended subject to the following conditions:
1) Granting of the landscape and screening variances by the Board of Adjustment.
2) q.a.~, a '~'~ ....4.~,4......,~.. c.......~ ..... ..... .~ ....... , (CONDITION MET, HOWEVER
PLEASE SEE ATTACHED COMMENTS FROM LEISURE SERVICES DEPARTMENT.)
4) Modify the landscape plan to incorporate the following changes:
mb"Mafiorz. (common m~
(CO~ON ~
(common ~
DIR. INITIALS: e~~
Agenda Request Form - 2/99
CITY MANAGER REVIEW:
Document Name: ~CREEKVsp
CITY OF COPPELL
PLANNING DEPARTMENT
STAFF REPORT
CASE: Creek View Phase II, Lot Block Site Plan
P & Z HEARING DATE:
C.C. HEARING DATE:
LOCATION:
June 17, 1999
July 13, 1999
Southeast comer of Denton Tap Road and Bethel Road.
SIZE OF AREA:
1.147 acres of property; 7,946 square foot office building
CURRENT ZONING:
REQUEST:
R (Retail)
Site Plan approval.
APPLICANT:
HISTORY:
Owner:
Creekview-Denton Tap I, Ltd.
465 Denton Tap Road
Coppell, TX 75019
(972) 462-8668
FAX: (972) 393-3917
Architect:
Plans By Design
17480 Dallas Parkway, Ste. 119
Dallas, TX 75287
(972) 380-5705
FAX: (972) 380-5803
City Council approved the final plat for this property on June 8, 1993.
TRANSPORTATION:
Denton Tap Road is a P6D, six-lane divided improved major
thoroughfare contained within a 100 to 120 right-of-way. Bethel
Road is a local dead-end road east of Denton Tap Road within an 80
foot right-of-way.
SURROUNDING LAND USE & ZONING:
North- vacant; Retail
South - Dental office; Retail
East - Single-family; PD104-SF-9
West o vacant; Commercial
Item # 7
COMPREHENSIVE PLAN:
The Comprehensive Plan shows the property as suitable for
mixed uses.
DISCUSSION:
This property was platted 6 years ago with a shared 24' fire lane and access
easement along the south property line. When Dr. Gemoules' property was
developed, a portion of the 24'-wide shared access easement was paved.
At that time, the 10' wide landscape buffer requirement on either side of
the shared driveway was not part of city code. The property in question is
an irregular shaped parcel of land with a densely treed area on the rear
third of the property, as well as an existing driveway on its property. The
observance of a 1 O'-wide landscape buffer immediately to the north of the
existing driveway would make this property undevelopable for office,
retail and/or commercial purposes. Therefore, the applicant must seek a
variance from the Board of Adjustment with regards to the 10'-wide
perimeter landscaping buffer requirement. In addition, as this project is a
nonresidential use adjacent to a single-family residential district, the
zoning ordinance calls for a screening wall not less than 6 feet in height
separating the use from adjacent residential. As there is a creek separating
this property from the adjacent homes and the rear third of the property is
densely treed, the applicant is requesting that the screening wall be
waived. Staff supports the request; however, the applicant will have to
seek a screening wall variance also from the Board of Adjustment.
The building elevations indicate an attractive office structure with a
residential style of architecture. The exterior building materials show a
combination brick and stone faqade. The submitted brick sample is a
burgundy sand, an earth-toned color brick, the stone sample is a white
stone, and the roof is a lusterless rustic black laminated asphalt shingle.
Staff requests that the color of the exterior building materials should be
specified on the elevation drawings.
The landscape plan needs to be modified. As submitted, the number of
trees shown on the plan does not meet code. The plan shows 11 trees
being planted but the applicant is required to have 19 trees on site. As the
tree survey is still incomplete, it is unclear how many trees will be
preserved. Staff is corrfident that the applicant will be able to offset the
outstanding tree requirement with the number of trees being preserved on
site. However, the landscape tabulations need to be altered. As Denton
Tap Road is a primary image zone, the perimeter tree ratio for Denton Tap
is 1 tree :for every 40 feet of frontage. Also,~ the required non-vehicular
open space landscape requirement is 6,302 sf. The project tabulation on
the Site Plan must match the information presented on the landscape plan.
The site coverage percentage must reflect building and pavement, not
building alone. The site plan shows a different sidewalk configuration by
the main entry to the building on the eastern elevation. There are
inconsistencies regarding the location of the handicap parking along the
southern elevation of the driveway. The landscape plan should be
Item # 7
modified to reflect the fountain and plant features and the parking
configuration on the site plan. Also, staff requests an elevation of the
proposed fountain.
Lastly, the proposed signage is shown to be a 28 square foot momunent
sign along Denton Tap Road. The sign is brick with a cap stone cap. Four
cast stone plaques are shown for tenant names. Staff would rather see a
sign identifying the building, not the businesses. Planning and Zoning
Commission will be asked to make a determination on the appropriateness
of the tenant names on the sign.
RECOMMENDATION TO THE PLANNING AND ZONING COMMISSION:
Staff recommends approval of the Site Plan subject to the following conditions being met:
1) Granting of the landscape and screening variances by the Board of Adjustment.
2) Submit a tree survey for staff review and approval.
3) Indicate color of all exterior building materials on the building elevations.
4) Modify the landscape plan to incorporate the following changes:
a) Reflect the 1 tree per 40 linear feet for the Denton Tap frontage in the
landscape tabulations.
b) The required non-vehicular open space landscape requirement is 6,302 sr.
c) Match site plan configuration of the sidewalk by the main entry to the
building on the eastern elevation, as well as the location of the handicap
parking along the southern elevation of the driveway.
d) Incorporate the fountain and plant features proposed on the site plan and
submit a fountain elevation for staff review and approval.
5) Project tabulations on the Site Plan must match the information presented on the
landscape plan.
6) Monument sign should identify the building only.
ALTERNATIVES:
1)
2)
3)
4)
Recommend approval of the request.
Recommend disapproval of the request
Recommend modification of the request
Take under advisement for reconsideration at a later date.
ATTACHMENTS:
1) Site Plan
2) Landscape Plan
3) Floor Plan
3) Building Elevations
4) Departmental Comments
Item# 7
DEVELOPMENT REVIEW COMMITTEE
LEISURE SERVICES COMMENTS
ITEM: Creek View Office Building, Phase 1I, Site Plan Review
DRC DATE: May 27, 1999 and June 3, 1999
CONTACT: Brad Reid, Park Planning and Landscape Manager
COMMENT STATUS: PRELIMINARY F4NAg P~V!SED
The tree survey for this property shows a total of 902 inches of trees on the site. The
drawings show that development is removing 396" of trees from the site. Development
is preserving 506' of trees, allowing a preservation credit of 56%. The total caliper
inch of tree removed requiring mitigation is 174 inches.
The landscape plan shows the addition of 15' of new trees to the site. This will reduce
the number of caliper inches requiring mitigation to 159 inches.
The Tree Preservation Ordinance allows for the replanting of new trees to mitigate this
loss or the payment of $100 per caliper inch to the Coppell Reforestation and Natural
Areas Fund.
Please provide an executed Tree Removal Permit prior to removing trees from the site.