Creekview P2/SPRv-DR 990527 (8)DEVELOPMENT REVIEW COMMITFEE
LEIS LIRE SERVICES COMMENTS
!ITEM: Creek View Office Building, Phase Fl, Site Plan Review
DRC DATE: May 27, 1999 and June 3, 1999
CONTACT: Brad Reid, Park Planning and Landscape Manager
COMMENT STATUS: PRELIMINARY FtNAg REVISED
The tree survey for this property shows a total of 902 inches of trees on the site. The
drawings show that development is removing 396" of trees from the site. Development
is preserving 506' of trees, allowing a preservation credit of 56%. The total caliper
inch of tree removed requiring mitigation is 174 inches.
The landscape plan shows the addition of 15' of new trees to the site. This will reduce
the number of caliper inches requiring mitigation to 159 inches.
The Tree Preservation Ordinance allows for the replanting of new trees to mitigate this
loss or the payment of $100 per caliper inch to the Coppell Reforestation and Natural
Areas Fund.
Please provide an executed Tree Removal Permit prior to removing trees from the site.
BIR
DRC429991