Loading...
Copperstone/AmP-DR 960725 (4) JUL 2 5 Igg6 "~IELECTRiC Comments for the City of Coppell Development Review Committee Preliminary/Final Plat is not acceptable. Easements will be required for proposed electric facilities. A plat with easement requirements will be provided to the developer. Load information (size of structure, A/C / Heat Load) will be required from the developer before easements can be 0determined- ther comments ~ ¢ ~'~'~Z~ ~ ~ Please call me at 214-888-1307 if you have any questions. Tim Brancheau 14a00 Jose3 Lane Farmers Branch. Texas 75234