Copperstone/AmP-DR 960725 (4) JUL 2 5 Igg6
"~IELECTRiC
Comments for the City of Coppell
Development Review Committee
Preliminary/Final Plat is not acceptable.
Easements will be required for proposed electric facilities.
A plat with easement requirements will be provided to the
developer.
Load information (size of structure, A/C / Heat Load) will
be required from the developer before easements can be
0determined-
ther comments ~ ¢ ~'~'~Z~ ~ ~
Please call me at 214-888-1307 if you have any questions.
Tim Brancheau
14a00 Jose3 Lane Farmers Branch. Texas 75234