Loading...
Cpl Town Ctr/PP-DR 960530 (2) ! NAY3 Jl996 DEVELOPMENT REVIEW COMMI'ITEE ' ' ENGINEERING COMMENTS ITEM: Coppell Town Center Addition. IVe 'lunina~ Plat and Replat (drawing submitted is labelled as a Final Plat), to create a ~ingle lot that will allow the development of the Criminal Justice building and the future Fire Station #$ as well as accommodate the existing Town Center, located on south side of Parkway Blvd., approximately 295.50 feet from Denton Tap Road, at the request of Pacheco Koch Consulting Engineers, Inc. DRC DATE: May $0, 1996 and June 6, 1996 CONTACT: Mike Martin, E. L T., Assistant City Engineer (304-3679) COMMENT STATUS: ~'PRELIMINARY FINAL P~gq~O 1. On site plan, relocate sidewalk away from back of curb on Town Center and Parkway Blvd. 2. Show all fire lanes on plat. 3. Provide a total of 25' for utility easement on the east side of Town Center Blvd.