Loading...
Cpl Town Ctr/PP-DR 960530 DEVELOPMENT REVIEW COMMITTEE .... ENGINEERING COMMENTS ITEM: Coppell Town Center Addition, Prelimina~_ Plat and Replat (drawing submitted is labelled as a Final Plat), to create a single lot that will allow the derelopment of the Criminal Justice building and the future Fire Station #$ as well as accommodate the existing Town Center, located on south side of Parkway Blvd., approximately 295.50 feet from Denton Tap Road, at the request of Pacheco Koch Consulting Engineers, Inc. DRC DATE: May 30, 1996 and June 6, 1996 CONTACT: Mike Martin, E.I.T., Assistant City Engineer 004-3679) COMMENT STATUS: .°°~'r ..~,~...... ,a~rn~A ..~.. ov /FINAL ~E4gggD No comments