Loading...
Cpl Town Ctr/PP-DR 960530 (5) W,;ELECTRIC Comments for the City of Coppell Development Review Committee Preliminary/Final Plat for ~_~'~ ~r_.x._~ ~'~)/~A-) ~---/~T~'I'~~ Preliminary/Final Plat is~acceptable. Easements will be required for proposed electric facilities. A plat with easement requirements will be provided to the developer. Load information (size of structure, A/C / Heat Load) will be required from the developer before easements can be determined. Other comments Please call me at 214-888-1307 if you have any questions. Tim Brancheau 14400 Josey Lane Farmers Branch, Texas 75234